CITY OF SANTA ANA
<br />
<br />Engineering Design and
<br />Landscaping Services
<br />
<br />Staffing
<br />
<br />DMJM+HARRIS has assembled aqualified
<br />team of professionals to support this annual
<br />contract for engineering and landscaping
<br />design services. Shown below is an
<br />organization chart of the entire
<br />DMJM+HARRIS Team. Brief paragraphs
<br />describing their qualifications, education
<br />and representative experience follow.
<br />
<br />I
<br />
<br />CITY OF SANTA ANA
<br />Pro~ect Directo~
<br /> Soun Amiranl, P.~.
<br />
<br /> t
<br /> Pmje~t Marmger
<br /> I~t Somerville, P.E.
<br />
<br /> I
<br /> I
<br />
<br /> Principal-in-Charge
<br /> and QA/QC
<br /> Viotor Martinez, P.E.
<br />I
<br />
<br /> Street Design
<br />~ Ce~-ante~, P.E.
<br />
<br /> Tmf~YSignal
<br />Adrien Hindiyeh, P.E.,T.E.
<br />
<br /> Drainage
<br /> Gary Sjelln, P.E.
<br />
<br /> Survey
<br />Ruel del Ca~tillo, PL$ tc)
<br />
<br /> Nu~n Shah, $.E.
<br />
<br /> Miscellaneous
<br /> Structural
<br /> P~er K~ng, $,E., RE.
<br />
<br />Roes Kt'~, P.E., GE.
<br />
<br />Constru~ion
<br />e-ieo~e Gil~, P.E.
<br />
<br />Lynn Cagouya, ASIA(L)
<br />Gerald Offia, ASLA 04
<br />
<br />N{ ~aff are DMJM+HARRIS
<br />except as noted:
<br />LA - Leighton &Associates, Inc.
<br />C Coast Sunmyi~g, Inc. (DBE)
<br />L - Lynn Capouya, Inc.
<br />
<br />Other Services
<br />
<br /> Architect
<br />Jim Tabb, RA
<br />
<br /> Mechanical
<br />Andy Reed, P.E.
<br />
<br /> Electrical
<br />Ben Ma~cardo, P.E.
<br />
<br />SWPPP Compliance
<br />Kiel M~
<br />
<br />Principal Engineer
<br />B.S / 1993/Civil Engineering
<br />1996/Civil Engineer/Califomia (gC0.56141 )
<br />
<br />Mr. Somerville has more than 15 years experience in the
<br />geometric design of roadways, storm drains, sewers and
<br />water lines, pavements, on-site facilities relating to grading
<br />and drainage, hydrology and hydraulics, traffic patterns,
<br />street lighting systems and traffic signals, and parking
<br />layouts. His experience also includes production of fea-
<br />sibility studies, plans, specifications and estimates, com-
<br />puter aided design in AutoCAD and Microstation, preparation
<br />of right-of-way maps, acquiring permits to enter and
<br />construct, preparation of stage construction plans, and
<br />construction support services which includes field engi-
<br />neering, RFI and submittal review, and claims analysis.
<br />Mr. Somerville began his career with the City of Fullerton
<br />and thoroughly understands agency processes, project
<br />finance, and needs analysis, as well as technical and
<br />contractual requirements in the design and construction
<br />of projects.
<br />
<br />Capital Improvement Program, City of Tustin, Cali-
<br />fornia: Project Engineer for the City of Tustin for
<br />management of major transportation projects. Projects
<br />
<br />wtuled over $36 million in construction and included
<br />Edinger Avenue Widening, Newport Avenue / SR55 Ramp
<br />Reconfigurafion, Newport Avenue Bridge at Edinger and
<br />Tustin Ranch Road Bridge at Edinger. Work scope consisted
<br />of management of design consultants and tracking of
<br />project budgets and schedule. Coordinated issues in all
<br />phases of the project including environmental, right of
<br />way issues, design and construction. Responsible for
<br />approving consultant invoices and change orders as well
<br />as preparing City Council agenda items.
<br />
<br />On-Call Engineering Services, City of Santa Aha,
<br />California: Principal Engineer working as an extension
<br />of City staff to provide engineering services in support
<br />of the City's Capital lmprovemeat Program. Projects
<br />have an estimated construction value of $2 million and
<br />have included First Street Rehabilitation, Traffic Controls
<br />Plans for Bristol and McFadden, Studies, Evaluations and
<br />Reports for several projects throughout the City, and
<br />Building Improvements at Thornton Park.
<br />
<br />Arterial Street Reconstruction, City of Fullerton,
<br />California: Project Engineer on this multi-year Capital
<br />Improvement Program for the City. Work effort included
<br />identifying arterial streets in need of rehabilitation and
<br />providing PS&E for approximately two miles of arterial
<br />streets per year. Several methods of reconstruction were
<br />
<br />MU01-559 8
<br />
<br />
<br />
|