Laserfiche WebLink
CITY OF SANTA ANA <br /> <br />Engineering Design and <br />Landscaping Services <br /> <br />Staffing <br /> <br />DMJM+HARRIS has assembled aqualified <br />team of professionals to support this annual <br />contract for engineering and landscaping <br />design services. Shown below is an <br />organization chart of the entire <br />DMJM+HARRIS Team. Brief paragraphs <br />describing their qualifications, education <br />and representative experience follow. <br /> <br />I <br /> <br />CITY OF SANTA ANA <br />Pro~ect Directo~ <br /> Soun Amiranl, P.~. <br /> <br /> t <br /> Pmje~t Marmger <br /> I~t Somerville, P.E. <br /> <br /> I <br /> I <br /> <br /> Principal-in-Charge <br /> and QA/QC <br /> Viotor Martinez, P.E. <br />I <br /> <br /> Street Design <br />~ Ce~-ante~, P.E. <br /> <br /> Tmf~YSignal <br />Adrien Hindiyeh, P.E.,T.E. <br /> <br /> Drainage <br /> Gary Sjelln, P.E. <br /> <br /> Survey <br />Ruel del Ca~tillo, PL$ tc) <br /> <br /> Nu~n Shah, $.E. <br /> <br /> Miscellaneous <br /> Structural <br /> P~er K~ng, $,E., RE. <br /> <br />Roes Kt'~, P.E., GE. <br /> <br />Constru~ion <br />e-ieo~e Gil~, P.E. <br /> <br />Lynn Cagouya, ASIA(L) <br />Gerald Offia, ASLA 04 <br /> <br />N{ ~aff are DMJM+HARRIS <br />except as noted: <br />LA - Leighton &Associates, Inc. <br />C Coast Sunmyi~g, Inc. (DBE) <br />L - Lynn Capouya, Inc. <br /> <br />Other Services <br /> <br /> Architect <br />Jim Tabb, RA <br /> <br /> Mechanical <br />Andy Reed, P.E. <br /> <br /> Electrical <br />Ben Ma~cardo, P.E. <br /> <br />SWPPP Compliance <br />Kiel M~ <br /> <br />Principal Engineer <br />B.S / 1993/Civil Engineering <br />1996/Civil Engineer/Califomia (gC0.56141 ) <br /> <br />Mr. Somerville has more than 15 years experience in the <br />geometric design of roadways, storm drains, sewers and <br />water lines, pavements, on-site facilities relating to grading <br />and drainage, hydrology and hydraulics, traffic patterns, <br />street lighting systems and traffic signals, and parking <br />layouts. His experience also includes production of fea- <br />sibility studies, plans, specifications and estimates, com- <br />puter aided design in AutoCAD and Microstation, preparation <br />of right-of-way maps, acquiring permits to enter and <br />construct, preparation of stage construction plans, and <br />construction support services which includes field engi- <br />neering, RFI and submittal review, and claims analysis. <br />Mr. Somerville began his career with the City of Fullerton <br />and thoroughly understands agency processes, project <br />finance, and needs analysis, as well as technical and <br />contractual requirements in the design and construction <br />of projects. <br /> <br />Capital Improvement Program, City of Tustin, Cali- <br />fornia: Project Engineer for the City of Tustin for <br />management of major transportation projects. Projects <br /> <br />wtuled over $36 million in construction and included <br />Edinger Avenue Widening, Newport Avenue / SR55 Ramp <br />Reconfigurafion, Newport Avenue Bridge at Edinger and <br />Tustin Ranch Road Bridge at Edinger. Work scope consisted <br />of management of design consultants and tracking of <br />project budgets and schedule. Coordinated issues in all <br />phases of the project including environmental, right of <br />way issues, design and construction. Responsible for <br />approving consultant invoices and change orders as well <br />as preparing City Council agenda items. <br /> <br />On-Call Engineering Services, City of Santa Aha, <br />California: Principal Engineer working as an extension <br />of City staff to provide engineering services in support <br />of the City's Capital lmprovemeat Program. Projects <br />have an estimated construction value of $2 million and <br />have included First Street Rehabilitation, Traffic Controls <br />Plans for Bristol and McFadden, Studies, Evaluations and <br />Reports for several projects throughout the City, and <br />Building Improvements at Thornton Park. <br /> <br />Arterial Street Reconstruction, City of Fullerton, <br />California: Project Engineer on this multi-year Capital <br />Improvement Program for the City. Work effort included <br />identifying arterial streets in need of rehabilitation and <br />providing PS&E for approximately two miles of arterial <br />streets per year. Several methods of reconstruction were <br /> <br />MU01-559 8 <br /> <br /> <br />