Laserfiche WebLink
CITY OF SANTA A~A <br /> <br />utilized including both hot and cold recycling of the existing <br />asphalt, complete reconstruction, localized reconstruction, <br />rubberized asphalt, concrete bus pads, and pavement <br />reinforcing fabrics. Traffic control plans and utility <br />coordination were provided for each project <br /> <br />Highland Avenue Grade Separation, Fullerton, Cali- <br />fornia: Project Manager for the City of Fullerton for the <br />$8.6 million federally-funded project. Responsible for all <br />feasibility studies, public bearings, preliminary alignments, <br />cross-sections, quantities, and cost estimates. Determined <br />requirements and prepared right-of-way maps. Developed <br />plans for temporary and permanent modifications to adjacent <br />parcels and building to main~in access and operations. <br />Provided QA/QC for the City through the design process. <br /> <br />C.B.D. Parking Upgrade, Fullerton, California: De- <br />veloped the site layout for the two main parking areas <br />for the Central Business District in downtown Fullarton. <br />Several parcels were acquired to accommodate these lots, <br />and the design balanced the need to maximize parking <br />and ingress/egress while creating a pedestrian friendly <br />environment with hardscapo and landscape improvements. <br />Additional design elements included the preparation of <br />demolition, site, grading, elec~ical, and hardscape plans, <br />coordination with utility companies for an Underground <br />Utility District. <br /> <br />Downtown Sidewalk Improvements, Fullerton, Cali- <br />fornia: Project Engineer for this project which constructed <br />decorative sidewalk in the downtown sector. Responsible <br />for determining the treatments to be used, including colored <br />concrete, exposed aggregate, concrete and brick banding <br />to enhance the pedestrian corridor. Extensive public <br />interaction was required with the local business owners, <br />informing them of the pending construction, provisions <br />being made to maintain pedesUian access to their business, <br />and to address their concerns. <br /> <br />Independence Park Improvements, Fullerton, Cali- <br />fornia: Prepared the conceptual layout for site and parking <br />improvements in conjunction with the expansion of this <br />City park. The existing parking area was reconfigured <br />to provide safer traffic circulation and maximize parking, <br />and a protected drop-off zone was provided. The plan <br />provides addilional parking by constructing two new parking <br />lots on the site. These lots will be constructed in phases <br />to minimize impacts during construction. <br /> <br />RichmanfvValnut Avenue Storm Drain, Fullerton, <br />California: Project Manager for this consultant designed <br />project that involves the installation of 6,000 lineal feet <br />of R.C.P., 1,700 l.f. of D.I.P. and 500 l.f. of V.C.P. <br />Coordinated this design with the consultant, provided QA/ <br />QC for the City, verified location of all public and private <br />utilities, coordinated pothole efforts, and identified the <br />required relocations. Prepared the applications for the <br />two crossings of the BNSF facility, channel entry of the <br />County (OCFCD) facility, and the required OSHA permits <br />for the jack-boring operation. <br /> <br />Engineering D~sign attd <br />Landscaping Services <br /> <br />Street Design-Lead <br /> <br />BS/1995/Civil Engineering <br />2000/Civil Engineer, Califomiag60535 <br /> <br />Mr. Cervantes is a Civil Engineer with over 11 years of <br />experience in highway and structure engineering and design <br />for roadway and structure elements of infrastructure <br />improvements. He has a solid understanding of drainage <br />facility elements including hydrology and hydraulic cal- <br />culations and design of detention basins. <br /> <br />$2'~ Street Widening, Vernon, California: Project <br />Engineer responsible for design and construction man- <br />agement of ~-mile-long street widening project. Several <br />methods of reconstruction were utilized including both <br />hot and cold recycling of the existing asphalt, complete <br />reconstruction, localized reconstruction, rubberized as- <br />phalt, concrete bus pads, and pavement reinforcing fabrics. <br />Project included coordination with property owners and <br />several utility companies. <br /> <br />Alameda Street Improvement, Vernon, California: <br />Project Engineer for this l-mile-long section of roadway <br />improvements along the Alameda Corridor. Responsible <br />for preparing the legal description within the City right- <br />of-way. <br /> <br />1-710 Interchange Improvements, City of Vernon: <br />Project Coordination representing the City for this ½-mile- <br />long interchange improvement project at Atlantic and Bandiui <br />and the AlamedaCorddor pre-construction mitigation studies <br />project. Duties include supervising the work of con- <br />sultents, preparing engineering work for the city; reviewing <br />environmental and design reports; preparing engineering <br />reports and power point presentations; relating to con- <br />sultants, Caltrans, MTA, and affected property owners. <br /> <br />CMD Sewer Design, Vernon, California: Design Engineer <br />responsible for providing PS&E for new and upgrade of <br />existing system within 1 square mile of the city limits. <br />Design involved the analysis of the existing systems and <br />inflows, sizing of the proposed lines and siphon, and <br />developing horizontal and vertical alignments to minimize <br />utility conflicts. Prepared layout, details, and utility design <br />using CADD. <br /> <br />Storm Water Management and Compliance: Project <br />Engineer responsible for reviewing plans and specifications <br />to ensure all city projects complied with NPDES permitting <br />requirements and guidelines. Services including report <br />preparation and storm water program overview. <br /> <br />Century Theatre Improvements, Vernon: Developed <br />the master plan of parking for the retail/entertainment zone <br />as part of ~ Redevelopment funded project. The master <br />plan included interim parking layouts for the different <br />phases of development, and also included the preliminary <br />layout for a parking lot to be constructed in the final <br />phase of development. <br /> <br />MU01-559 9 <br /> <br /> <br />