My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP (8)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 1:55:11 PM
Creation date
3/5/2025 12:52:09 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP
Contract #
A-2025-017
Agency
Public Works
Council Approval Date
2/18/2025
Expiration Date
2/17/2027
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Check & Perinits: <br />Construction drawings shall be in accordance with the 2019 California Building Code and will require <br />review/approval by the City Planning and Building Agency. <br />As a condition of plan check approval, plans, specifications and Structural calculations must be signed by a California <br />licensed architect / landscape architect /civil engineer/structural engineer as appropriate. Additionally, the architect <br />will be encouraged to identify their historic consultant to address questions and concerns related to the historical <br />preservation of the building. Plans shall be organized so that they call be segregated cleanly for distribution to the <br />various plan checking entities. <br />The Public Works Agency Project Manager will coordinate the submittal and review process. Once complete, the <br />consultant will revise the Contract Documents <br />Final Opinion of Probable Cost <br />Consultant shall provide updated opinion of probable construction cost which shall reflect finalized plans, materials, <br />systems, details of construction, and known or anticipated changes in the bidding market relative to the project. <br />Should project scope exceed available budget, project plans/specifications will be phased as appropriate. <br />Task 3: BNA&lertisement, Construction Administration, ReeordDrawingV: <br />BiclAdvertisemeni <br />Bidding procedures will be the responsibility of the City. While the PS&E construction package is advertising for <br />bids, all questions concerning the intent shall be referred to the City for resolution. In the event that any item requiring <br />interpretation in the drawings or specifications is discovered during the bidding period, said items shall be analyzed <br />by the Consultant for decision by the City. Consultant shall provide support to the City during the Bidding phase by <br />assisting with questions, requests for info rmation/clarificati on, or conflicts arising Out of the bidding process. <br />Consultant shall also attend pre -bid meeting, if scheduled. <br />Construction Administration <br />Consultant shall provide support to the City during the Construction Administration phase by assisting with questions, <br />requests for information/clarification, and/or reviewing Submittals. Consultant shall review and approve all <br />submittals and shop plan drawings required to support the construction contract. Consultant shall complete shop <br />drawings reviews within two (2) weeks of receipt. Contract Change Order reviews shall be completed within two (2) <br />working days of receipt. Consultant shall be available as requested by the City to resolve discrepancies in the contract <br />documents. Consultant shall bring to the attention of the City any defects or deficiencies in the work by the <br />construction contractor which the Consultant may observe. Consultant shall have no authority to issue instruction on <br />behalf of the City, or to deputize another to do so. <br />Record Drawings ljs-built Plans: <br />Upon construction completion, consultant shall incorporate as -built information, as provided by the General <br />Contractor, into the drawing files to provide record drawings for City at•ch.ives. The Consultant shall prepare and <br />deliver to the City the final as -built plans incorporating field marked prints supplied by the City. Upon completion <br />of construction, the City will submit field -marked prints to Consultant. Consultant shall incorporate all changes <br />to the plans electronically with all necessary revision notations and submit to the City. <br />City of Santa Ana RFP 24-1 OOA <br />Page Al-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.