contract, the parties will agree which bill to consider predominant, i.e. to classify as the "month" by <br />name only. <br /> 1. Utility rates and costs used for savings calculations are outlined in Exhibit D, Article 6, <br /> Utility Rate Structures. <br /> 2. Natural gas, oil, purchased steam, water and other purchased utilities usage's shall be <br /> determined by the method described above for electricity. <br /> <br />4.2.2 Metrix Calculations. The Tuning Period's utility data and weather parameters will be entered <br />into Metrix or calculated using a substantially similar algorithm. Metrix will adjust the Tuning Period <br />Data based on weather and operational conditions during the Annual Savings Period to estimate the <br />energy and energy costs of the Facility had CONTRACTOR not performed the Work (the "Baseline"). <br /> CONTRACTOR will adjust energy savings for variations in energy consumption due to <br /> (a) Local weather conditions. <br /> (b) Occupancy level changes, hours of operation, <br /> (c) Structural modifications, modifications to energy consuming equipment, <br /> (d) Damaged or malfunctioning equipment, and <br /> (e) Any variances from the proposed operating schedules, strategies and conditions upon which <br /> the calculated savings are based on, and described in the Exhibit D, Article 7, "Contracted <br /> Baseline" that could affect energy usage. <br /> There may be changes in the Facility's usage and operation for which a calculated <br /> adjustment is necessary. Either the CLIENT or CONTRACTOR may propose an <br /> adjustment procedure based upon acceptable engineering practices to account for any <br /> such changes. <br /> The Baseline for each month of the Annual Savings Period for each energy type (excluding kW <br /> demand adjustments) will be calculated as follows: <br /> BL = B x (Ti - Ti-l) + CH X HDDm~,~ + Cc x CDDBc,~ + C~ x U~,~ + C2 x U2,~ + C3 x U3,i <br /> <br />where: <br /> <br />BL = <br />B = <br />Ti - Ti-1= <br />CH, Cc= <br />HDDB~,~ = <br />CDDBc,i = <br />BH, BC = <br />C1, C2, C3 = <br />added load) <br />Ui,i, U2,i, U3,1 <br /> <br />Baseline (Utility Units) <br />Baseload consumption per unit time (Utility Units/day) <br />time interval between date Ti and Ti-1 (days) <br />Coefficients for Heating and Cooling Degree-days (Utility units/deg-day) <br />Time history of Heating degree-days (°F-day or °C-day) <br />Time history of Cooling degree-days (°F-day or °C-day) <br />Heating and Cooling degree-day base temperatures (°F-day or °C-day) <br />Coefficients for user variables 1,2,3 (e.g. occupancy/schedule, space utilization, <br /> <br />= Coefficients for user variables 1,2,3 <br /> <br />The Baseline for each month of the Annual Savings Period for each energy type for kW <br />demand adjustments will be calculated as follows: <br />Dm = B + C. x HDD~.,~ + Cc x CDD~c,1 + C~ x U~,~ + C2 x U2,~ + C3 x U3,i <br /> <br />where: <br />B - <br /> <br />Baseload consumption per unit time (Utility Units/day) <br /> <br /> <br />