Laserfiche WebLink
one of the most dominant faults in regard to potential seismic <br />shaking impacts. The project site could potentially be subject <br />to a maximum credible horizontal ground acceleration of 0.30g <br />from a magnitude 6.9 earthquake along the Newport/Inglewood <br />fault zone. A seismic event of this scale could potentially <br />result significant damage to the proposed project. However, the <br />seismic risks at the project site would not be considered <br />significantly different from other areas in the southern <br />California region. The proposed project would not involve any <br />new construction and therefore would not increase the risk for <br />seismic impacts. <br /> <br />(A-3) Less Than Significant Impact <br /> <br />soil liquefaction occurs when loose soil deposits below the <br />water table are subjected to large ground accelerations <br />generated from seismic events. Liquefaction is generally known <br />to occur in saturated cohesionless soils at depths shallower <br />than about 50-feet. <br /> <br />According to the City's General Plan Land Use Element EIR, the <br />project site is located in an area that is characterized with <br />high to very high liquefaction potential. However, the proposed <br />project would not involve any new construction and therefore <br />would not increase the risk for liquefaction impacts. <br /> <br />(A-4) No Impact <br /> <br />The project site is flat without any topographical relief. <br />According to the City's General Plan Land Use Element EIR, <br />are no landslide planes on the project site. Therefore, <br />implementation of the project would not result in adverse <br />impacts in regards to landslides. <br /> <br />there <br /> <br />(B) No Impact <br /> <br />The proposed project site would not involve earthwork activity. <br />Therefore, implementation of the proposed project would not <br />result in erosion or sedimentation impacts. <br /> <br />(C) NO Impact <br /> <br />According to the City's General Plan Land Use Element EIR, the <br />proposed project site does not contain any unique geologic <br />features. Therefore, implementation of the proposed project <br />would not result in adverse impacts to any unique geologic <br />feature. <br /> <br />6 <br /> <br />75.A. <br /> <br /> <br />