My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLUGER ARCHITECTS 1 - 2003
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
KLUGER ARCHITECTS 1 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2016 1:08:43 PM
Creation date
5/10/2004 3:34:07 PM
Metadata
Fields
Template:
Contracts
Company Name
Kluger Architects
Contract #
A-2003-237
Agency
Public Works
Council Approval Date
12/1/2003
Expiration Date
1/10/2005
Insurance Exp Date
8/21/2004
Destruction Year
2021
Notes
Amended by A-2003-237-01
Document Relationships
KLUGER ARCHITECTS 1A - 2003
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Plumbing: <br />• Cold Water: Yes <br />• Hot Water: Yes <br />• Waste/Vent: Yes <br />• Floor Drain: Yes (4%6" square with removable catch basin) <br />• Electrical: <br />• Interior: fluorescent <br />• Exterior: over main door <br />• Special Notes: Provide waterproof GFI outlets and switches. Provide threaded <br />conduit and boxes, recessed in walls and ceilings. Seal all conduits. Mount at <br />minimum 3'-0" above finished floor. <br />• Communication: <br />• Provide one telephone <br />• Special Requirements as budget allots: <br />• Provide space for Necropsy Table (by others) <br />• Eyewash <br />• Exam Light (by others) <br />• Stainless steel counters and sink <br />• Wall Cabinets, wall mounted (no legs), with 3'-0" clearance underneath <br />• Refrigerator (supplied by others), on 12" raised platform. <br />• Refer also to notes on Conceptual Floor Plan (Exhibit "C") <br />3. The following design requirements shall conform to the City of Santa Ana and other <br />governmental agency requirements including, but not limited to: <br />• Santa Ana Municipal Code <br />• 1998 California Building Code (CBC) <br />• American's with Disabilities Act <br />• 1998 California Energy Code (Title 24, Part 6) <br />• 1998 California Mechanical Code (CMC) <br />• Appliance Standards, California Code of Regulations, Title 20 <br />• 1998 California Electrical Code (CEC) <br />• 1998 California Fire Code (CFC) <br />• National Fire Protection Association <br />• US Dept. of Agriculture <br />C. Scope of Work: The following tasks shall be provided by the consultant <br />Task- 1- Pte -Design Nfeeting <br />a. Meeting shall be coordinated by City's Project Manager. <br />b. Discuss project scope with Zoo Design Review Team to review and refine design criteria, <br />program objectives, specific areas of concern and goals. <br />c. Define project schedule dates. <br />d. Obtain documents and information from City Park Planning Staff as outlined in "City <br />Responsibilities" section.' - <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.