Laserfiche WebLink
<br />One Broadway Plaza <br />Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />T -8 Westbound Santa Clara Avenue shall be re-striped at Broadway Street to provide one left <br />turn lane and one shared left turnlright turn lane. The project proponent shall pay all <br />costs (design, construction, administration and inspection) associated with this re-striping <br />when project building pennits are issued. <br /> <br />T-9 Northbound Grand Avenue from Fruit Street to 14th Street shall be re-striped at Santa <br />Ana Boulevard/I-5 HOV ramps to provide three northbound travel lanes. The project <br />proponent shall pay all costs (design, construction, administration and inspection) <br />associated with this re-striping when project building pennits are issued. <br /> <br />T -10 1-5 northbound off-ramp' shall be re-striped to provide a westbound left turn lane, a <br />shared left turnlright turn lane and a right turn lane at Grand Avenue. The project <br />developer shall pay all costs (design, pennitting, construction, administration and <br />inspection) when building pennits are issued. <br /> <br />T-11 <br /> <br />A new traffic signal shall be installed at the intersection of Main Street and 15th Street. <br />Communications cable and conduit required to connect the traffic signal to the City of <br />Santa Ana's Traffic Signal Master System shall be a part of traffic signal installation. <br />The project proponent shall pay all costs (design, construction, administration and <br />inspection) associated with this signalization when project building pennits are issued. <br /> <br />T -12 A new traffic signal shall be installed at the intersection of Santa Ana Boulevard and <br />French Street. Communications cable and conduit required to connect the traffic signal <br />to the City of Santa Ana's Traffic Signal Master System shall be a part of traffic signal <br />installation. The project proponent shall pay all costs (design, construction, <br />administration and inspection) associated with this signalization when building pennits <br />are issued. <br /> <br />T -13 A new traffic signal shall be installed at the intersection of Sycamore Street and 15th <br />Street. Communications cable and conduit required to connect the traffic signal to the <br />City of Santa Ana's Traffic Signal Master System shall be a part of traffic signal <br />installation. The proj ect proponent shall pay all costs (design, construction, <br />administration and inspection) associated with this signalization when building pennits <br />are issued. <br /> <br />T-14 The project proponent shall pay the appropriate City Transportation System Improvement <br />fee to help <;>ffset the One Broadway Plaza Projects' impact on the City of Santa Ana <br />street system. ' . <br /> <br />T -15 The developer should coordinate with the Orange County Transportation Authority (OCT A) <br />to identify ways to enhance transit use by tenants of One Broadway Plaza. The project <br />developer shall install a bus stop, bus transit or any other transit related improvements if <br />requested by the OCT A. <br /> <br />T -16 The project proponent shall satisfy the relevant requirements of the City's TDM Ordinance, <br />including confonnity of site plans with facility standards specified in the TDM Ordinance, <br /> <br />U/vfregoso/wp5 J /reports/One Broadway final findings <br />June 28, 2004 <br /> <br />Page 26 <br />