Laserfiche WebLink
<br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />"1J:;tJ <br />[\) CD <br />(Coo <br />CD 0 <br />....>.2" <br />~= <br />0 0 <br />_:J <br />......¡Z <br />(,.)~ <br />N <br />0 <br />0 <br />~ <br />I <br />0 <br />N <br />0 <br /> <br />TABLE 1 <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule DeDartment <br />T-19 To assure use of onsite parking as intended, the project proponent or their successor will require that all commercial At the Certificate of Executive Director of the <br /> tenant leases specify that employees must park onsite within the One Broadway Plaza parking garage. In addition, the Occupancy (CC&Rs) and PW AIPBA or hislher <br /> property manager will require that parking personnel patrol adjoining properties on a daily basis to enforce such lease during operations. designee. <br /> provisions. This daily patrol will be performed by a uniformed parking employee driving a utility vehicle that will be <br /> signed to identify it as a part of the One Broadway Plaza Management. The areas to be patrolled will be marked on a <br /> grid map of the streets surrounding One Broadway Plaza. <br />T-20 The project developer shall provide pedestrian access around the project site during project construction activities and During all site preparation, Executive Director of the <br /> post appropriate signs around the site directing pedestrians to use the sidewalks across the street from the project site. grading and construction. PW AIPBA or hislher <br /> Permanent sidewalks shall be installed around the project site to provide for pedestrians access to the site. designee. <br />T-21 Prior to approval of the project plans, the project proponent will file a Notice of Proposed Construction or Alteration During final design. Executive Director of the <br /> with the FAA. Conditions placed on the project by the FAA will be incorporated in the final design and construction PBA or hislher designee. <br /> of the project office tower. <br />T-22 Prior to approval ofthe project plans, the project proponent shall take the project to the Orange County Airport Land During final design. Executive Director of the <br /> Use Commission for a review and consistency determination. PBA or hislher desil!nee. <br />T-23 After certification of the project Final EIR, the project proponent shall apply to the Caltrans Aeronautics Department During final design. Executive Director ofthe <br /> for a State helipad Permit. PBA or hislher designee. <br />T-24 In order to minimize traffic from the One Broadway Plaza project from entering the French Park Neighborhood, the At certificate of occupancy Public Works Agency <br /> traffic diverters currently located in French Park shall become permanent <br />T-25 Vehicles traveling westbound on Washington Avenue shall be diverted either northbound or southbound at At certificate of occupancy Public Works Agency <br /> Main Street. <br />T-26 Vehicles traveling eastbound on Tenth Street shall be diverted either northbound or southbound at At certificate of occupancy Public Works Agency <br /> Main Street. <br />