Laserfiche WebLink
<br />8 <br /> <br />8 <br /> <br />8 <br /> <br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />TABLE 1 <br />MITIGA TION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />:;tJ <br />CD <br />00 <br />Q. <br />S. <br />õ' <br />:J <br />"1Jz <br />[\) 0 <br />(C . <br />CDN <br />....>.0 <br />010 <br />0 ~ <br />-0 <br />-"" N <br />(,,)0 <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule Department <br /> Hazardous Materials <br />HZ-I The City shall require the site demolition and remodeling contractors to conduct a building by building inspection for During all demolition, Executive Director of the <br /> the presence of asbestos-containing materials prior to the issuance of demolition permits for the site. The demolition renovation and remodeling of PBA or his/her designee. <br /> contractor may submit copies of asbestos inspection reports for the site already prepared to satisfy SCAQMD Rule existing structures. <br /> 1403 to fulfill this requirement. <br />HZ-2 The City shall require the site demolition and remodeling contractors to conduct a building by building inspection for During all demolition, Executive Director of the <br /> the presence of lead-based paint prior to the issuance of demolition permits for the site. Building inspection reports renovation and remodeling of PBA or his/her designee. <br /> already prepared by the contractor to satisfy Cal-OSHA worker safety requirements may be submitted to fulfill this existing structures. <br /> mitigation measure. <br />HZ-3 Any use of hazardous materials or generation of hazardous wastes on the proposed project site must be conducted in During all site preparation, Executive Director of the <br /> accordance with applicable federal, state and local regulations. grading and construction. PBA or his/her designee. <br /> Noise <br />N-I Project construction shall be limited to the hours of 7 a.m. to 8 p.m. on Monday through Friday and from 8 a.m. During construction. Executive Director of the <br /> to 8 p.m. on Saturday. Construction shall not be allowed on Sunday or federal holidays. PBA or his/her designee. <br />N-2 Temporary noise barriers shall be installed between the project construction area and adjacent residents. These During construction. Executive Director of the <br /> noise barriers may include the use of leaded blankets, an acoustic blanket or several layers of plywood. "Bravo" PBA or his/her designee. <br /> acoustic blankets may also be used. Barriers should be 16 to 20 feet high. <br />N-3 The commercial buildings in the project will require mechanical ventilation to keep outside noise from entering During final design. Executive Director of the <br /> the interior of these buildings. The central ventilation systems for the buildings shall allow for sufficient PBA or his/her designee. <br /> ventilation so that office windows can be closed. Air conditioning units may be adequate for mechanical <br /> ventilation as long as they meet the ventilation requirements of the UBe. This shall be coordinated with the <br /> project's mechanical engineer. <br />N-4 Prior to any site preparation, grading or construction, the project contractor will provide the Principals at the Prior to the beginning of Executive Director of the <br /> Orange County High School ofthe Arts and the EI Sol Science and Arts Academy with the project construction construction. PBA or his/her designee. <br /> schedule indicating the type of construction activity and duration. The project construction schedule shall <br /> address all construction activity from the start of the Droiect to completion. <br /> Population and Housinl!; <br />There are no significant adverse population and housing impacts and no mitigation is required. <br /> Public Services <br />PS-I The design of the project parking structure shall conform to the City of Santa Ana Police Department's design During final design. Executive Director of the <br /> standards for parking structures. PBA or his/her designee <br /> and SAFD. <br />PS-2 The design of the project shall include on site office spaces for the SAPD, which will be shared with any on site During final design and at Executive Director of the <br /> security staff. Two designated parking spaces will be provided for the SAPD near the main entrance of the Certificate of Occupancy. PBA or his/her designee <br /> proposed One Broadway Plaza project. and SAFD. <br />PS-3 Prior to issuance of building permits, the project developer shall submit a construction phasing plan for the At issuance of the first Executive Director of the <br />