Laserfiche WebLink
<br />"1J:;tJ <br />[\) CD <br />(Coo <br />CD 0 <br />....>.2'" <br />O>~ <br />0 0 <br />_:J <br />-.... z <br />(,.)9 <br />N <br />0 <br />0 <br />.þ. <br />I <br />0 <br />N <br />0 <br /> <br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />TABLE 1 <br />MInGA nON MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule Department <br /> proposed project to the SAFD. The plan will be consistent with SAFD Fire Code requirements. Also, the project building permit. PBA or his/her designee <br /> developer shall provide evidence to the SAFD that the proposed fire protection services will be adequate to serve and SAFD. <br /> the proposed project development. A fire exit shall be provided in the office building along with adequate fire <br /> protection facilities and equipment to serve the proposed 37-storv office building. <br />PS-4 Prior to issuance of building permits, the project developer shall submit a construction phasing plan for the project At issuance of the first Executive Director of the <br /> to the SAFD. This plan will show that emergency vehicle access to the project site is adequate. Emergency building permit. PW A or his/her designee <br /> access will be orovided on Washington Avenue and Sycamore Street. and SAFD. <br />PS-5 The final design of the project shall include fire sprinklers in the office building and parking garage at locations During final design. Executive Director of the <br /> specified by the SAFD. The project shall also conform with all applicable SAFD fire protection and access PBA or his/her designee <br /> requirements. and SAFD. <br />PS-6 The final design of the project shall include fire hydrants at locations specified by the SAFD. During final design. Executive Director of the <br /> PBA or his/her designee <br /> and SAFD. <br />PS-7 The project developer shall notify the SAFD and SAPD when the office building helipad is operational. At or after Certificate of Executive Director of the <br /> Occupancy. PBA or his/her designee. <br /> SAFD and SAPD. <br />PS-8 The project developer shall contribute a fair share amount to have an emergency vehicle preemption detector At issuance of first building Executive Director of the <br /> placed on the existing traffic signal arm at the intersection of Broadway Street and 10th Street, Broadway Street permit. PW A or his/her designee, <br /> and Washington Avenue and Washington Avenue and Sycamore Street. These detectors shall also be placed on SAFD and SAPD. <br /> any other traffic signal and modified as part of this project. <br />PS-9 The project developer shall incorporate a repeater in the design of the project to prevent interference with Police During final design. Executive Director of the <br /> and Fire Department radio signals. PBA or his/her designee, <br /> SAFD and SAPD. <br />PS-IO Prior to the issuance of building permits, the project developer shall submit evidence to the City of Santa Ana of a At issuance of the first Executive Director of the <br /> fee payment between the develooer and the SAUSD to offset school facilitv related impacts. building permit. PBA or his/her designee. <br />PS-II The project site and sidewalks adjacent to the site shall be properly barricaded to prevent unauthorized access to During all site preparation, Executive Director of the <br /> the site during project construction activities. grading and construction. PBA or his/her designee. <br />PS-12 The Principals at Willard Intermediate School, the Orange County High School of Arts, EI Sol Science and Arts Prior to any site preparation, Executive Director of the <br /> Academy and Davis Elementary School shall be notified by the project developer before project construction grading or construction. PBA or his/her designee. <br /> begins that students may be required to use sidewalks on the opposite sides of streets to avoid project construction <br /> activities and closure of the sidewalks adjacent to the project site. <br />PS-13 The project developer shall submit to the Santa Ana Unified School District a School Access Plan that provides During all site preparation, Executive Director of the <br /> for the safe passage of students to and from Willard Intermediate School and the Orange County High School of grading or construction PBA or his/her designee. <br /> the Arts. The plan shall be subject to approval by the Santa Ana Unified School District before construction <br /> activities are initiated. The School Access Plan shall include, but not be limited to: <br />