Laserfiche WebLink
<br />One Broadway Plaza <br />Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />8 <br /> <br />T-8 <br /> <br />T-9 <br /> <br />T-10 <br /> <br />T-ll <br /> <br />T-12 <br /> <br />8 <br /> <br />T-13 <br /> <br />T-14 <br /> <br />T-15 <br /> <br />8 <br /> <br />T-16 <br /> <br />Westbound Santa Clara Avenue shall be re-striped at Broadway Street to provide one left <br />turn lane and one shared left turn/right turn lane. The project proponent shall pay all <br />costs (design, construction, administration and inspection) associated with this re-striping <br />when project building permits are issued. <br /> <br />Northbound Grand Avenue from Fruit Street to 14th Street shall be re-striped at Santa <br />Ana Boulevard/I-5 ROV ramps to provide three northbound travel lanes. The project <br />proponent shall pay all costs (design, construction, administration and inspection) <br />associated with this re-striping when project building permits are issued. <br /> <br />1-5 northbound off-ramp shall be re-striped to provide a westbound left turn lane, a <br />shared left turn/right turn lane and a right turn lane at Grand Avenue. The project <br />developer shall pay all costs (design, permitting, construction, administration and <br />inspection) when building permits are issued. <br /> <br />A new traffic signal shall be installed at the intersection of Main Street and 15th Street. <br />Communications cable and conduit required to connect the traffic signal to the City of <br />Santa Ana's Traffic Signal Master System shall be a part of traffic signal installation. <br />The project proponent shall pay all costs (design, construction, administration and <br />inspection) associated with this signalization when project building permits are issued. <br /> <br />A new traffic signal shall be installed at the intersection of Santa Ana Boulevard and <br />French Street. Communications cable and conduit required to connect the traffic signal <br />to the City of Santa Ana's Traffic Signal Master System shall be a part of traffic signal <br />installation. The proj ect proponent shall pay all costs (design, construction, <br />administration and inspection) associated with this signalization when building permits <br />are issued. <br /> <br />A new traffic signal shall be installed at the intersection of Sycamore Street and 15th <br />Street. Communications cable and conduit required to connect the traffic signal to the <br />City of Santa Ana's Traffic Signal Master System shall be a part of traffic signal <br />installation. The project proponent shall pay all costs (design, construction, <br />administration and inspection) associated with this signalization when building permits <br />are issued. <br /> <br />The project proponent shall pay the appropriate City Transportation System hnprovement <br />fee to help offset the One Broadway Plaza Projects' impact on the City of Santa Ana <br />street system. <br /> <br />The developer should coordinate with the Orange County Transportation Authority (OCTA) <br />to identify ways to enhance transit use by tenants of One Broadway Plaza. The project <br />developer shall install a bus stop, bus transit or any other transit related improvements if <br />requested by the OCT A. <br /> <br />The project proponent shall satisfy the relevant requirements of the City's TDM Ordinance, <br />including conformity of site plans with facility standards specified in the TDM Ordinance, <br /> <br />Resolution No. 2004-020 <br />Page 49 of 73 <br />