My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC COAST CABLING 3 - 2004
Clerk
>
Contracts / Agreements
>
P
>
PACIFIC COAST CABLING 3 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 1:55:19 PM
Creation date
12/8/2004 4:48:26 PM
Metadata
Fields
Template:
Contracts
Company Name
Pacific Coast Cabling
Contract #
A-2004-189
Agency
Finance & Management Services
Council Approval Date
9/20/2004
Expiration Date
9/21/2007
Insurance Exp Date
1/1/2008
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8.3 Services NOT requiring a jOb walk <br /> <br />8.3.1 When the scope of work calls for the simple addition of several cable drops, a job <br />walk is not necessary and billing can usually be handled on a Time and Material <br />basis - as determined by the City's Telecommunications Coordinator or his/her <br />delegated representative. However, a Cabling Services Proposal Form still needs <br />to be completed by the Vendor and approved by the City's Telecommunications <br />Coordinator or his/her delegated representative. <br /> <br />8.4 Change of Work to be performed <br /> <br />8.4.1 If during the performance of approved cabling services it is determined by the <br />Vendor that there will be a substantial increase to the scope of work (and <br />subsequent increase in cost and time schedule) as described in the Cabling <br />Services Proposal Form, work is to immediately stop and is not to continue without <br />the approval of the City's Telecommunications Coordinator or his/her delegated <br />representative in the form of a signed Vendor-provided Change Order Form. <br /> <br />8.5 Taxes <br /> <br />All applicable taxes shall be included under the Pricing Plan portion of any the Cabling Services <br />Proposal Form (see Appendix B). <br /> <br />8.6 Payment Schedule <br /> <br />The City will pay invoices based on the following schedule: <br /> <br />8.5.1 Material: Upon Acceptance by the City's Telecommunications Coordinator or <br />his/her delegated representative of the completed project as specified in 2.11 of <br />Appendix E "Technical Standards and Operating Procedures for Cabling Services". <br /> <br />8.5.2 Labor: Upon acceptance by the City's Telecommunications Coordinator or his/her <br />delegated representative of the completed project as specified in 2.11 of Appendix <br />E "Technical Standards and Operating Procedures for Cabling Services". <br /> <br />8.5.3 Other charges: Upon approval of the City's Telecommunications Coordinator or <br />his/her delegated representative. <br /> <br />8.7 Testing / Documentation <br /> <br />For Testing and Documentation requirements, refer to Sections 2.10 (Testing and Certification) <br />and 2.11 (Completion) in Appendix E - Technical Standards and Operating Procedures for <br />Cabling Services. <br /> <br />8.8 Rework / Problem Resolution <br /> <br />Refer to Section 2.3 (Responsibilities of Vendor) in Appendix E - Technical Standards and <br />Operating Procedures for Cabling Services. <br /> <br />Page 14 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.