My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - FESTIVAL HALL IMPROVEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
12/20/2004
>
23A - FESTIVAL HALL IMPROVEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:59:51 PM
Creation date
12/14/2004 12:06:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23A
Date
12/20/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Appropriation Adjustment and <br />Contract Award for Festival Hall <br />Restroom Improvements (Project 2741A) <br />December 20, 2004 <br />Page 2 <br /> <br />DISCUSSION <br /> <br />Due to close proximity of Olson Loft project <br />Sycamore and Second Streets, a noise mitigation <br />required which consisted of replacement of windows <br />transmission class rating in compliance with City's <br />addition an air conditioning system needed to be <br />doors and windows were to be closed during operating <br /> <br />and Festival Hall on <br />of Festival Hall was <br />and doors wi th sound <br />noise ordinance. In <br />installed since the <br />hours. <br /> <br />Olson Company was conditioned to fund $286,000 for noise mitigation. An <br />agreement was executed between the City and Festival Hall to construct <br />the noise mitigation improvements prior to occupancy of the lofts. <br />During the plan check process, the City realized that restroom <br />accessibility is required to comply with California Building Code. The <br />noise mitigation improvements were constructed as Phase I to meet the <br />occupancy schedule for the Olson Loft project. <br /> <br />In order to comply with California Building Code requirement, <br />improvements for Festival Hall proj ect are required to address <br />accessibility. Restroom improvements were not part of the <br />scope of the noise mitigation and not conditioned on Olson <br />Instead this became an obligation of the Redevelopment Agency <br />agreement between the City and Festival Hall. <br /> <br />Phase I I <br />restroom <br />original <br />Company. <br />per the <br /> <br />The Notice Inviting Bids was advertised on September 15 and 17, 2004, and <br />bids were opened on October 6, 2004. A summary of the bid invitations <br />mailed, the bids received, and the bid results follows. <br /> <br />Santa Ana Contractors receiving notices: 3 <br />Contractors requesting bidding documents: 3 <br />Bids received: 3 <br />Bids received from Santa Ana Contractors: 1 <br /> <br />Name of Bidder <br /> <br />City <br /> <br />Bid Amount <br /> <br />1. Thomco Construction, Inc. <br />2. Hanan Construction, Inc. <br />3. Hardine Enterprises, Inc. <br /> <br />Anaheim <br />Paramount <br />Santa Ana <br /> <br />$33,500.00 <br />$42,000.00 <br />$54,460.68 <br /> <br />23A-2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.