My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 2100 S. BRISTOL ST.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
02/07/2005
>
31A - 2100 S. BRISTOL ST.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:58:47 PM
Creation date
2/1/2005 12:31:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
2/7/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />No Impact <br /> <br />The proposed project involves the construction and <br />operation of a laundromat facility. Implementation of the <br />proposed project would not increase the demands for <br />existing recreation facilities or generate the demand for <br />additional recreation facilities. <br /> <br />xv. TRANSPORTATION/TRAFFIC <br /> <br />A. <br /> <br />Cause an increase in traffic, which is substantial in <br />relation to the existing traffic load and capacity of <br />the street system? <br /> <br />B. <br /> <br />Exceed, either individually or cumulatively, a level <br />of service standard established by the county <br />congestion management agency for designated roads or <br />highways? <br /> <br />Less Than Significant Impact <br /> <br />The proposed project is consistent with the City's General <br />Plan and the traffic projections within the Circulation <br />Element. The Public Works Department has determined that <br />implementation of the proposed project would not result in <br />significant project-related traffic impacts or individually <br />or cumulatively exceed any required level of service <br />established by the City or by the County's Congestion <br />Management Program. <br /> <br />c. <br /> <br />Result in a change in air traffic patterns, including <br />either an increase in traffic levels or a change in <br />location that results in substantial safety risks? <br /> <br />No Impact <br /> <br />The proposed project involves the construction and <br />operation of a single-story laundromat facility. <br />Implementation of the proposed project would not result in <br />any changes to air traffic patterns. The proposed project <br />would not result in any substantial safety risks related to <br />aircraft traffic. <br /> <br />D. <br /> <br />Substantially increase hazards to a design feature <br /> <br />No Impact <br /> <br />19 <br /> <br />3~~46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.