Laserfiche WebLink
<br />----- <br /> <br />RFP 2-0611 <br />EXHIBIT A <br /> <br />Task 1.4 External Peer Review <br /> <br />CONSULTANT will perform Peer Reviews of the PE phase work products as directed by <br />AUTHORITY. The procedures to utilize local, regional, and national professional expertise will <br />be developed and refined during the first stage of the PE effort, as the critical review milestones <br />are determined. CONSULTANT will initially prepare a list for PE Peer Reviews, and prepare <br />summary reports of Peer Reviews performed. The list and summary reports will be submitted to <br />the AUTHORITY for review and approval. <br /> <br />Task 1.5 Public Outreach <br /> <br />AUTHORITY will retain primary responsibility for all Public Outreach efforts. CONSULTANT <br />may be called upon to assist in integrating the technical and consensus-building aspects of the <br />PROJECT within the Santa Ana, Costa Mesa, and Irvine communities. <br /> <br />Task 1.6 Proiect ManaGement Plan Review <br /> <br />CONSULTANT will review the updated PMP prepared by the PE consulting firm, and present <br />findings to the AUTHORITY. The PMP will be responsive to FTA's requirements. At least four <br />months prior to completion of the PE, the PE consulting firm will prepare a final PE updated PMP <br />that will cover Final Engineering and Construction. CONSULTANT will review this document with <br />the AUTHORITY. The purpose of this PMP will be to obtain FTA approval to advance the <br />PROJECT into Final Design. Therefore, the PMP must include all FTA-required elements and <br />requirements. CONSULTANT will summarize all comments and suggestions on the two PMPs <br />prepared by the PE consulting firm into a PMP Review Findings Report. <br /> <br />Task 1.7 Proiect ManaGement OversiGht Contractor (PMOC) <br /> <br />In conformance with Federal Rules and Regulations, FTA will assign a Project Management <br />Oversight Contractor (PMOC) to monitor the PROJECT's development. CONSULTANT may be <br />called upon to assist in coordinating with the PMOC. This will be accomplished by involving the <br />PMOC in project meetings, steering committee meetings, access to project correspondence and <br />documents necessary to perform their role. It is also anticipated that FTA will want to schedule <br />quarterly reviews and other periodic review meetings after the grant request for PE has been <br />processed, <br /> <br />Task 1.8 Special Studies <br /> <br />It is anticipated that a variety of related special studies, and analyses may be required to support <br />the PROJECT. Topics of special studies may be related to technology, analyses of impacts on <br />existing utilities, constructability reviews, structures, and value engineering. As directed by the <br />AUTHORITY, CONSULTANT will prepare the required special studies during the duration of the <br />Contract. <br /> <br />Task 2 Participating City Staffing <br /> <br />CONSULTANT will provide AUTHORITY with approved Senior Level Staff to provide support to <br />the three participating Cities of Santa Ana, Costa Mesa, and Irvine with LRT expertise. These <br />Senior Staff persons will be co-located with City technical staff at each respective City's <br />facilities, as directed by each city. At AUTHORITY's request, this task may include other <br />dedicated technical and administrative staff as needed to assist the Cities with the PE phase of <br />the PROJECT. CONSULTANT will be responsible for performing its work in accordance with <br />the requirements set forth in this RFP. <br /> <br />4 of 10 <br />