<br />RFP 2-0611 <br />EXHIBIT A <br /> <br />Task 2. 1 Desian Manaaement <br /> <br />AUTHORITY will have PROJECT oversight responsibilities and approval authority to ensure <br />their standards for design, quality, constructability, maintainability, and safety are adhered to <br />during the PE phase of the PROJECT. CONSULTANT will provide Quality Assurance (QA) <br />services for PE firm design submittals to ensure design is done in conformance with the contract <br />documents and all applicable FTA, state, local agency, environmental, and regulatory <br />requirements. <br /> <br />CONSULTANT QA activities will include the following: <br /> <br />. Assist in reviewing and approving the PE firm's quality control procedures and ensure <br />quality control is practiced and maintained throughout the duration of the PROJECT. <br /> <br />. Ensure that the QA policies and procedures established by the Project Management <br />Plan for design quality, constructability, maintainability, and safety are adhered to by the <br />PE phase consultants. <br /> <br />, , <br /> <br />Task 3 Budget/Program Cost Control <br /> <br />CONSULTANT will assist in the development of the PROJECT cost estimates and budgets for <br />each future phase of the PROJECT (e,g. Final Design, and Construction). CONSULTANT will <br />- review and validate the PE consulting firm's PROJECT cost estimate for Final Design, and <br />Construction of the PROJECT. CONSULTANT will work with AUTHORITY to update quarterly <br />the cost estimate as the PROJECT evolves. Any proposed changes to PROJECT will be <br />submitted to AUTHORITY for review and approval and evaluated based upon the impacts to <br />PROJECT costs, schedule, and budget. <br /> <br />The project management and project controls work is critical to the success of the PROJECT. <br />The PMP will establish the project-wide management controls that are to be used by <br />CONSULTANT throughout the PROJECT. CONSULTANT will be responsible to name and <br />provide key staff capable of monitoring the PE consulting firm's management and controls <br />program, <br /> <br />The objective of a cost control program is to analyze, forecast, monitor, and report cost data in a <br />timely fashion to review actual and forecasted costs verses an established baseline or budget. A <br />flexible cost control system is required to integrate schedule, budget, actual, and forecasted <br />data. The CONSULTANT's cost control system will integrate the following vital ingredients: <br /> <br />. A detailed Work Breakdown Structure (WBS). <br />. A well defined control base (budget). <br />. OCTA's Interactive Fund Accounting System (IFAS). <br />. Flexible reporting system for detailed and summary cost reports. <br />. An efficient method of identifying deviations from thè control base. <br />. A forecasting mechanism that accurately reflects the current cost outlook. <br /> <br />Report formats, data selection, and the timing of reports will vary depending on management <br />needs and the project's requirements. Major categories of cost data contained on virtually all <br />reports will include: <br /> <br />5 of 10 <br />