Laserfiche WebLink
<br />RFP 2-0611 <br />EXHIBIT A <br /> <br />Task 10 Constructability Review <br />CONSULTANT will ensure that the preliminary designs (30% complete level) being developed can <br />be readily constructed and that adverse impacts to the community are minimized. CONSULTANT <br />will provide experienced construction personnel to perform a Constructability Review of the PE <br />phase design, including traffic maintenance during construction. CONSULTANT will prepare and <br />submit its findings for the AUTHORITY's review and approval on the constructability and traffic <br />maintenance of the proposed design. Tolerances being specified in the designs will be checked to <br />make sure they are within acceptable ranges or explained in subsequent design packages. The <br />expected construction sequence and duration will be estimated, Any need to schedule utility work <br />around rail construction will be noted. Construction work that appears to require multiple <br />contractors must be evaluated and coordinated to minimize conflicts and potential schedule delays. <br />The availability of adequate staging areas will be assessed and recommendations will be made for <br />construction easements. The need for construction permits, haul routes, and hazardous waste <br />disposal sites will also be noted in the reports. <br /> <br />PROJECT construction within streets must be carefully reviewed to make sure that traffic impacts <br />, , <br />are minimized. CONSULTANT will work closely with the participating City's traffic engineers in the <br />review of these types of impacts. <br /> <br />Task 11 Value Engineering (VE) <br />The purpose of this work element is to assure that the designs being recommended are cost- <br />effective, within budget, and are not excessive. <br /> <br />Within 120 calendar days prior to the completion of the PE phase, the design will undergo a Value <br />Engineering (VE) review by CONSULTANT before being finalized, CONSULTANT will recommend <br />any areas where it believes costs might be reduced. The PE consulting firm will assist <br />CONSULTANT by providing explanations, background material, etc. VE recommendations will be <br />summarized in a 30% Design VE Report by CONSULTANT for incorporation into the beginning of <br />the Final Engineering phase. The 30% Design VE Report will be submitted to AUTHORITY within <br />30 calendar days of completion of the VE for review and approval. Subsequently, upon receiving <br />AUTHORITY comments, CONSULTANT will provide a final 30% VE Report within 15 calendar <br />days, <br /> <br />Task 12 <br />Task 12.1 <br /> <br />Document Control <br />Document Control Plan and Implementation <br /> <br />CONSULTANT will analyze the PE consulting firm's PROJECT document control system for <br />compatibility with existing AUTHORITY systems and for the effectiveness in controlling all <br />project documents being submitted for the PE phase. Identification of appropriate software for <br />the document control system, and establish PROJECT document control and security <br />procedures will also be recommended by CONSULTANT. The document control analysis for <br />the effective control of all PROJECT documents will be submitted within 45 calendar days after <br />issuance of the NTP for the AUTHORITY'S review and approval. <br /> <br />The document control system analysis will address: <br /> <br />. <br /> <br />Correspondence control and distribution <br />Drawing control <br /> <br />. <br /> <br />8 of 10 <br />