My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RFP 2-0611 <br />EXHIBIT A <br /> <br />. <br /> <br />Record retention and archiving <br />Meeting agenda, minutes, and distribution <br />Procurement and contract administration document control <br /> <br />. <br /> <br />. <br /> <br />Upon completion of the document control system, a memorandum will be prepared detailing the <br />procedures to be followed. Document control, storage, and retrieval methods will include the <br />use of both hard copies and electronic records. Document control methods will handle <br />documents being developed (in progress), finalized documents (i.e. contract documents), and <br />documents representing as-built conditions. An electronic document management system with <br />a setup and file tracking system will allow PROJECT personnel and users ready access to all <br />documents stored in specific locations. When the PROJECT is complete, it is the intent to be <br />able to transfer the appropriate documents to the appropriate parties in a format that is <br />compatible with existing filing systems. <br /> <br />Task 12.2 <br /> <br />Document Control Manaaement <br /> <br />CONSULTANT will be prepared to assist at the AUTHORITY's offices with the review, coding, <br />distribution, and filing of incoming and outgoing PROJECT correspondence, establish a <br />technical library for PROJECT documents and resource material, and provide document <br />retrieval and reproduction services. The CONSULTANT wili establish control procedures for <br />baseline mapping and documents so that the location of all controlled copies are known and can <br />be efficiently reviewed and updated as changes are made. <br /> <br />Task 12.3 PE Phase Closeout <br /> <br />CONSULTANT will prepare a PE phase closeout plan for AUTHORITY and FTA review, and <br />approval. CONSULTANT will coordinate with the PE consulting firm for the completion and <br />submittal of all PE phase Drawings and Documents. <br /> <br />Task 13 QAlQC Program <br /> <br />CONSULTANT will monitor the Quality Assurance/Quality Control (QAlQC) Program <br />established by the PE consulting firm. Standard of quality will be established and monitored <br />beginning with the PE phase, and subsequently refined for each of the following stages, At <br />intervals requested by the AUTHORITY, CONSULTANT will prepare QAlQC validation reports <br />to document the measures taken by the PE consulting firm to achieve their QAlQC program. <br /> <br />The QAlQC program will be tailored to the PROEJCT for control and implementation of quality <br />assurance measures during all phases of the PROJECT. <br /> <br />Task 14 Utility Coordination <br /> <br />CONSULTANT will assist the PE consulting firm and the AUTHORITY in coordinating the <br />identification, relocation, protection, and abandonment of utilities required for the PROJECT. In <br />order to accommodate and facilitate the Final Design process, CONSULTANT will perform utility <br />coordination work that may be necessary between the end of the PE phase, and the award of <br />the Final Design contract. CONSULTANT utility coordination activities include, but are not <br />limited, to the foliowing: <br /> <br />. <br /> <br />During the specified timeframe, meeting with utility companies and other entities to <br />determine the relocation, protection, and abandonment requirements of utilities <br /> <br />9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.