Laserfiche WebLink
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />.--- <br />-~ <br /> <br />Scope of Work <br /> <br />PE 1. <br /> <br />Project Management and Project Controls <br /> <br />The Preliminary Engineering (PE) work elements must be properly managed to ensure they are <br />prefomled in a professional manner of the highest attainable quality, and are done within the <br />budget and schedule agreed upon by The AUTHORITY and the CONSULTANT. The project <br />management and project controls work is critical to the success of this project. The Project <br />Management Plan, described later, is to establish the project-wide management controls that are <br />to be used throughout The CenterLine Project. <br /> <br />The CONSULTANT will review what has been prepared in the Conceptual Engineering phase of <br />The CenterLine, and the Section 5309 New Starts Report that is part of The AUTHORITY's <br />submittal to the Federal Transportation Administration (FT A) for its approval of the CenterLine <br />, , <br />project's Preliminary Engineering phase. An initial task by the CONSULTANT wi\1, be <br />preparation of the quarterly update to the Project Management Plan. The last PMP update will <br />comply with FTA requirements to advance the CenterLine project into the Final Engineering <br />phase. The specific PMP requirements are described in sections PE 1.2 and PE 1.4. The <br />December 2001 Initial PMP submittal will be provided as the basis for the CÙNSULTANT's <br />first update, which will be transmitted to FT A. <br /> <br />The CONSULTANT will be responsible to name and provide key staff capable of providing the <br />project management and project control functions required for a Preliminary Engineering project <br />of this size and magnitude. There will be an independent Project OversightlProject Management <br />Consultant that will monitor the CONSULTANT's management and controls program. <br /> <br />At the conclusion of the Preliminary Engineering phase, The AUTHORITY will maintain the <br />right to request "on-call" services by the CONSULTANT including the Project Manager, and <br />possibly other key technical staff positions. The CONSULTANT's "on-call" project <br />involvement will be in the Final Engineering and Constmction phases of The CenterLine, <br /> <br />FE 1.1 Overall Requirements <br /> <br />The CONSULTANT will provide The AUTHORITY with an approved Project Manager for the, <br />project and other dedicated technical and administrative staff as needed to plan, organize, <br />supervise, coordinate and administer the various elements of the scope-of-work, Support to the <br />CONSULTANT's PE work will include contract and subcontract administration, accounting, <br />purchasing, offlce services, personnel administration, EEO assurance and reporting, DBE <br />utilization and reporting, publications support, and document and drawing controL Where work <br />has been subcontracted, the Project Manager will direct and monitor the subcontractor's work to <br />assure conformance with all design criteria, directives, quality control requirements, budgets, <br />schedules, etc, <br /> <br />2 <br /> <br />