My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6 <br /> <br /><JV <br /> <br /> <br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />-' <br />~..... <br /> <br />Definition of the Refined LPA: Consolidate the technical work and other relevant input that <br />resulted in the refined LP A. This would describe the design criteria, route alignment, stations, <br />vehicle systems, and Right of Way. The Project Definition Report will be reviewed ,by the <br />AUTHORlTY and Cities and presented to the public. <br /> <br />Summarize the results of the meetings and any revisions to the LP A, in preparation for <br />CenterLine Summit No.2, where the Project Definition would be adopted for the Second Phase <br />of work. ' <br /> <br />Deliverables: <br />. Draft and Final Project Definition Report. <br />. Updated plan and profile of the LP A within this segment. <br />. Sketches andlor renderings of stations, facilities and vehicles as necessary to help <br />illustrate station concepts for the project definition. <br /> <br />, , <br />" , <br /> <br />Minimum Operable Segment (MOS) Analysis: The Operable Segments Analysis is a critical <br />element of the PE effort. The purpose of the Operable Segments Analysis will be to defme and <br />evaluate up to four candidate operable segments that could be advanced along with the full <br />Locally Preferred Alternative for implementation as a possible starter line for' the CenterLine <br />proj ect. <br /> <br />>- Analvsis MethodOlogy <br /> <br />The CONSULTANT will assist in developing an operable segments analysis methodology <br />that is consistent with FTA's New Starts rail system project evaluation criteria. Once <br />defmed, the operable segments will be developed and evaluated with respect to mobility <br />improvements, cost effectiveness, environmental benefits, land use coordination, operating <br />efficiencies, financial capacity, and other measures of key concern to AUTHORITY and the <br />cities, as well as to FT A. ' <br /> <br />Among the criteria, of particular significance in the operable segments analysis will be cost <br />effectiveness, operating eff1ciencies, and financial capacity. With respect to cost <br />effectiveness, the incremental cost per passenger will be developed for each operable <br />segment and compared to the full LPA and to the baseline alternative. The comparative, <br />analysis of operating efficiencies will consider the operating costs of the candidate operable, <br />segments in comparison to annual system passenger miles, These will then be compared to <br />the full LPA and to the baseline alternative, <br /> <br />For purposes of the financial analysis, the CONSULTANT will work with AUTHORITY <br />staff to utilize the existing AUTHORlTY financial model, with validation and update of <br />input data and assumptions, as required. <br /> <br />Deliverables: <br />. Draft and Final Operating Segments Analysis Report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.