My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />Values, however, the costs associated with this Task are included in Schedule of Values Task <br />1.01.02. <br /> <br />Deliverables: <br />. Procedures Manual and required updates <br />. Updates as required <br /> <br />PE 1.4 Project Management Plan for Final Design and Construction <br /> <br />At least four months before the end of the Preliminary Engineering phase, the CONSULTANT <br />will update the Project Management Plan (PMP) to include Final Engineering and Constmction. <br />In undertaking this update, the CONSULT ANT will work closely with The AUTHORITY. This <br />PMP will describe how The AUTHORITY anticipates management of the overall CenterLine <br />project through the final design and constmction phases. It will evolve from the previous <br />iterations of the PMP. The purpose of this PMP will be to obtain FTA approval to advance the <br />CenterLine project into Final Design, Therefore, the PMP must include all FTA-required <br />elements and requirements. <br /> <br />As a result from the CONSULTANT's input during negotiations of the PE consulting services <br />contract, this PE 1.4 scope of work task will be Task 1.04 in CONSULTANT's Schedule of <br />Values. However, the costs associated with this task are included in Task 1.01.02 in the <br />CONSULTANT's Schedule of Values. <br /> <br />Deliverables: <br />. Draft and Final PMP for Final Design and Constmction <br /> <br />PE 1.5 Document Control Procedures <br /> <br />The purpose of this task is to establish a document control procedure which will accurately track <br />all project documents under the CONSULTANT's responsibility as they are prepared, reviewed, <br />and changed. ' <br /> <br />The CONSULTANT will review, code, distribute and file incoming and outgoing project, <br />correspondence, establish a technical library for project documents and resource material, and <br />provide document retrieval and reproduction services. The CONSULTANT shall establish <br />control procedures for baseline mapping and documents so that the location of all controlled <br />copies are known and can be efficiently reviewed and updated as changes are made. The <br />CONSULTANT will coordinate all design reviews and archive all design milestone submittals, <br /> <br />Deliverables; The specific work products to be prepared by the CONSULTANT are as follows: <br /> <br />. <br /> <br />Procedures indicating how the CONSULTANT will purchase or lease equipment, <br />supplies, etc., needed to perfonn this contract. <br /> <br />9 <br /> <br />- <br /> <br />-.-.._...~-., <br /> <br />- ~. ~ <br /> <br />..' <br />---- <br /> <br />CS',¡ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.