My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />- A Procedures Manual codifying <br />administering the project. ' <br /> <br />the policies and procedures to be followed in <br /> <br />. <br /> <br />'", <br /> <br />. <br /> <br />Document control procedures for the effective control of all project documents to be <br />submitted within 45 calendar days after NTP for The AUTHORITY'S approval. <br /> <br />As a result from the CONSULTANT's input during negotiations of the PE consuliii}g services <br />contract, this PE 1.5 scope of work task will be Tasks 1.05.01 (Procedures), arid 1.05.02 <br />(Implementation) in the CONSULTANT's Schedule of Values. <br /> <br />PE 1.6 Design Criteria and Standard Technical Specifications <br /> <br />The CONSULTANT will assemble, in one set of control documents, the basic criteria to be ,used <br />, , <br />to design and specify all CenterLine project elements. This task will be one ofthe first itemS- of <br />work to be presented to The AUTHORITY Board of Directors. This set is to be kept updated <br />during the contract duration. <br /> <br />The CONSULTANT will review all project criteria and specifications developetl in Conceptual <br />Engineering and the Rail System Specifications Report and will use this body of work as the <br />basis for an updated Design Criteria Manual and the set of Standard Technical Specifications. <br />The CenterLine project is not considered to be of a unique design or technology. Use of existing, <br />reliable, and proven designs and specifications should be encouraged and studied by the <br />CONSULTANT. All design criteria and project standards will be submitted to and approved by <br />The AUTHORITY before being added to the control documents, or changed. The <br />CONSULTANT will develop procedures to assure this is done. <br /> <br />The CONSULTANT will keep the Design Criteria Manual updated as more infonnation is <br />reviewed from other projects, or is learned about the CenterLine project and its design, <br /> <br />Deliverables: The products of this work task will be: <br /> <br />. <br /> <br />The Design Criteria Manual for the CenterLine project, updated as necessary. <br /> <br />. <br /> <br />The Standard Technical Specifications for The CenterLine Project, updated as necessary. <br /> <br />The following clarifications are included as part of the CONSULTANT's Schedule of Values. <br /> <br />. The initial set of basic criteria control documents for presentation to The Authority Board <br />of Directors will be completed by the end of month 2. <br />. The Design Criteria and Standard Technical Specifications for each discipline are <br />included in each of CONSULTANT's discipline Tasks. <br /> <br />10 <br /> <br /> <br />- - .' ~- --... ~- - - <br /> <br />-- - <-- <br /> <br />-- <br />--- <br /> <br />....,-tY'/ <br />0 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.