Laserfiche WebLink
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />engineering and architectural design shall be done on CADD in the format compatible with the <br />Conceptual Engineering phase. ' <br /> <br />Working from permanently monumented primary control points outside the.zone of any expected <br />construction activity on The CenterLine Project, the CONSULTANT shall establish secondary <br />and permanently monumented control points along the CenterLine alignment at approximately <br />I,OW-foot intervals. The secondary control points shall be tied into the primary cóntrol points <br />with an accuracy of I :50,000. The secondary control points should be located just outside the <br />zone of expected CenterLine project construction. <br /> <br />Mapping will show all existing major utilities and any other significant features. Where <br />necessary, enlarged details and cross-sections shall be prepared to assure against unacceptable' <br />conflicts. Planned utility improvements shall be added as they are encountered. Additional field <br />surveys will be perfoffi1ed to obtain elevations of overhead power lines, bottom of overhead <br />stmctmes and other design data not illustrated on base mapping."~ , <br /> <br />Engineering drawings of the PE alignment shall be done at 1"=40' scale. To the extent possible, <br />the alignment at this level of design is to be within one foot, horizontal and vertical, of its final <br />location. The mapping will be screened so that the project work is readily identified. <br /> <br />Station areas including the entire parking lot shall be drawn at 1"=20' scale. The base maps will <br />show all existing streets, buildings, other significant features, and property lines within the <br />station area. They shall be screened so that the station design is readily decipherable. For <br />stations without parking lots, the platform and its surrounding area shall be at 1"=20' scale. <br />There shall be a plan prepared for each station. These drawings will identify all station-related <br />stmctures including canopies/shelters, communication buildings, traction power substations, bus <br />loading areas, pedestrian paths, etc. Right-of-way boundaries will be delineated and, to the <br />extent possible, be within 2 feet of the expected final right-of-way needs. <br /> <br />The Central Maintenance Facility and yard (CMF) shall be designed at a 1"=20' scale. The <br />mapping will be screened and show all existing structures, buildings, other significant features, <br />roadways, and property lines. All yard track work, stmctures, power substations, car wash <br />facilities, fuel storage/pumping stations, roadways, parking areas, etc" will be shown. <br /> <br />The following paragraphs describe in greater detail the work scope that resulted <br />CONSULT ANT's input during negotiations of the PE consulting services contract. <br /> <br />from the <br /> <br />The following clarifications are included as part of the CONSULTANT's Schedule ofYalues: <br /> <br />Task 2,01 Mapping <br />. CONSULT ANT's project schedule is based on a 9O-day aerial mapping process, <br /> <br />Task 2.02 <br /> <br />Additional Field Surveys <br /> <br />14 <br /> <br /> <br />- <br />--~ <br /> <br />()lI" <br /> <br />