<br />AGREEMENT 1-2354 <br />Exhibit 'A <br /> <br />PE3. <br /> <br />Geotechnical Investigations <br /> <br />The purpose of this task is to determine the general soil conditions along the alignmerit 'of the <br />CenterLine project, at station and parking lots, at the site of the CMF, at traction power <br />substation sites not at the above locations, and at locations where aerial stntctures are <br />contemplated. <br /> <br />CONSULTANT will initially evaluate existing geotechnical information gathered in the Detailed <br />Conceptual Engineering, Study phase and available through the CONSULTANT's or other <br />sources to recommend a program for subsurface investigation at the site of the CMF and where <br />aerial sections are contemplated. The CONSULTANT will prepare a detailed summary of <br />required geotechnical work for field testing, soil boring, and laboratory testing of these locations, <br />and then coordinate the geotechnical engineering work. The CONSULTANT's geotechnical <br />engineers shall coordinate and monitor the subsurface investigation program, direct field, tests <br />and log all borings. The primary purpose of this work will be to determine if there are' .any <br />geotechnical and/or hazardous material concerns which, a) may preclude using those locations <br />f(,r the purposes intended, b) require clean-up or unusual site preparation work, and/or c) must be <br />incorporated into the subsequent design of the stntctures and buildings. <br /> <br />As the alignment is refined, station sites defined, and traction power substations located, a further <br />program of test borings and laboratory testing will be prepared by the CONSULTANT, in <br />consultation with The AUTHORITY, as the CONSULTANT deems warranted. <br /> <br />In both phases of site investigation, monitoring wells (including standpipe piezometers) will be <br />installed in selected borings as needed to allow monitoring of groundwater conditions. <br /> <br />CONSULTANT will prepare two Geotechnical Reports, one for the CMF and expected aerial <br />portions of the project, another covering the second phase of the work as the alignment is refined. <br />Each Geotechnical Report will include boring logs, field and laboratory test results, ground water <br />observations, subsurface and geological conditions, and any necessary interpretations of the <br />results. particular attention will be paid to any soils problems which may have been encountered. <br />Based on the information, design parameters for any structures, buildings, and other facilities <br />related to The CenterLine project will be recommended in the Reports. The CONSULTANT <br />shall also prepare guideline specifications for any expected earthwork. The locations of the test <br />borings, their plan and profiles and other relevant data shall be transferred to appropriate <br />mapping to be included in subsequent constntction contracts, <br /> <br />The Geotechnical Reports will also recommend a work plan for the Final Engineering phase that <br />is based on the findings of the geotechnical investigations performed under this scope. The <br />recommended work plan shall include additional field explorations, field testing, laboratory <br />testing, and engineering analyses. <br /> <br />Deliverables: The end products for the geotechnical investigations work will be as follows: <br /> <br />. <br /> <br />Draft and Final Geotechnical Reports: the first report for the CMF and aerial sections, <br />and aslightly later report for station sites, traction power substations and line segments. <br /> <br />15 <br /> <br />...-' <br />--, <br /> <br />ø <br /> <br />