Laserfiche WebLink
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />. Th~ reports will contain boring logs, contract drawings identifying the boring program, <br />and guideline specifications for inclusion in construction contract drawings. <br /> <br />. <br /> <br />Design recommendations for the CMF and station designers and structural engineers <br />based on any relevant findings of this work. <br /> <br />. <br /> <br />Work plan for any future geotechnical studies deemed necessary based on iheresults of <br />the initial investigations. ' <br /> <br />The following paragraphs describe in greater detail the work scope that resulted from the <br />CONSULTANT's input during negotiations ofthe PE consulting services contract. <br /> <br />The following clarifications are included as part of the CONSULT ANT's Schedule of Values: <br /> <br />Task 3.0 I Subsurface / Hazardous Material Program <br />. Task completion is expected within the first three (3) months. <br /> <br />, , <br />" , <br /> <br />Task 3.02 Geotechnical Reports <br />. This task will be completed within months 3-11. <br /> <br />PE4. <br /> <br />Plan and Profile Drawings <br /> <br />This work task entails the preparation of preliminary engineering drawings for the entire <br />alignment including plan aiJd profile drawings, cross-sections at key locations, and other data <br />necessary to delineate the location of the alignment and system structures. <br /> <br />CONSULTANT will utilize the alignment of the LPA as the basis for advancing the plan and <br />profile drawings for The CenterLine Project. The centerline of the track and other features will <br />be mathematized. The drawings will show all key horizontal points: tangent-to-spiral, spiral-to- <br />curve, curve-to-spiral and spiral-to-tangent. Track centerline geometry will be shown in tabular' <br />fonn, including curve and spiral data, stationing, curVe and spiral data, civil design speeds, and <br />special trackwork dc,ta, <br /> <br />The drawings will show station locations and the outline of major station features as they are <br />developed, including platfonns, shelters, bus facilities, any parking areas (that portion which can <br />be shown on the standard alignment map fonnat), and any access and egress roadways. The <br />location and outline of traction power substations will be shown. <br /> <br />The p1an drawings wi1l depict all traffic lanes shown in the traffic engineering studies that are <br />being done as part of Preliminary Engineering. <br /> <br />Where it is possible, profiles (at a scale of 1"= 10') will be shown on the same drawing as the <br />plan, The profiles will show surface, subsurface and above surface features including roadways, <br />railroads, structures, overpasses, and utilities, especially overhead utilities, in relationship to the <br /> <br />16 <br /> <br /> <br />. , <br /> <br />~-- <br />--- <br /> <br /><fì.V <br /> <br />