My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />Brid~: The CONSULTANT will prepare preliminary engineering drawings for any new <br />bridges the project will require. The drawings will be of sufficient detail in plan, elevation, <br />section views so that preliminary cost estimates can be prepared. Once selected, preliminary <br />engineering will be undertaken of all bridge sections. Plans will include structure cross- <br />section(s); plans and profiles including abutment locations, pier locations, and under-structure <br />clearances; and preliminary abutment, pier, and foundation structural designs. <br /> <br />Deliverables: The CONSULTANT will prepare the following as part of this work task: <br /> <br />. <br /> <br />Evaluation studies for aerial structure design options and <br />drawings of the aerial segments using the selected design(s). <br /> <br />preliminary engmeenng <br /> <br />. <br /> <br />Mock-ups/renderings for key elements and key areas, such as the Civic Center to SARTC <br />area (including St. Joseph Community and stlITounding area), Bristol Street key elements, <br />South Coast Plaza area, John Wayne Airport, and the Senior Center and Oak Creek areà: , <br /> <br />. Evaluation studies for major retaining walls design options and engineering drawings of <br />all major retaining walls using the selected design(s). <br /> <br />. <br /> <br />Evaluation studies for catenary poles design options and engineering drawings and <br />specifications for each design selected. <br /> <br />. <br /> <br />A Bridge Evaluation Report including inspection reports for all existing bridge structures <br />to be used by the CenterLine project and recommendations for the repair and retrofitting <br />of existing bridges. <br /> <br />0 <br /> <br />Preliminary designs of any required new bridge structures. <br /> <br />The following paragraphs describes in greater detail the work scope that resulted from the <br />CONSULTANT's input during the negotiations of the PE consulting services contract. <br /> <br />The following clarifications are included as part of the CONSULT ANT's Schedule of Values. <br /> <br />Task 5.01 Structurcs Criteria <br />. Design Criteria for PE 5. scope of work. <br /> <br />Task 5.02 Guideway Aesthetics Study <br />. This task consists of developing a general Guideway Aesthetic Study by analyzing the <br />aesthetic values of different types of superstructures, column configurations, straddle bent <br />configurations, catenary structures, and/or aesthetic treatments to such structural e1ements. <br />. This task will be completed within the first six (6) months. <br /> <br />Task 5.03 Neighborhood Fit Studies <br />. The CONSULTANT will evaluate up to four (4) possible design options for the aerial <br />structure and support columns. For each option, a general plan showing partial plan and <br /> <br />22 <br /> <br /> <br />-------. - <br /> <br />...........-::: <br /> <br />~c <br /><0' <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.