Laserfiche WebLink
<br />AGREEMENT 1-2354 <br />. Exhibit A <br /> <br />. <br /> <br />ete.vation views, and a typical section will be prepared. A probable cost will be detennined <br />for each alternative. ' , <br />The CONSULTANT will evaluate up to two (2) possible design options for the aerial stations <br />and support system. For each option, a general plan showing partial plan and elevation <br />views, and a typical section will be prepared. A probable cost will be detennined for each <br />alternative. <br />The CONSULTANT will evaluate up to three (3) possible design options for the catenary <br />structures. For each option, a general plan showing plan and elevation views, and a typical <br />section will be prepared. A probable cost will be detennined for each altemative. <br />In addition, the CONSULTANT will develop a neighborhood fit study for the various <br />segments described in the following Tasks. These studies will be completed within the first <br />six (6) months. <br /> <br />. <br /> <br />. <br /> <br />Neighborhood Fit Studies, Schedule of Values Task 5.03, is broken out as sub-tasks in the following <br />paragraphs as they were presented in CONSULTANT's technical proposal."~ , <br /> <br />Task 5.03.01 Central Santa Ana Segment <br />. This Task covers the neighborhood fit study in the general area for the Central Santa <br />Ana Segment, which extends from the Santa Ana Regional Transpðrtation Center to <br />Bristol/First. <br /> <br />Task 5.03.02 Bristol Street Segment <br />. This Task covers the neighborhood fit study in the general area of Bristol Street <br />Segment, which extends from FirstlBristol, with an option to Santa Ana College, to <br />Bristol/Sunflower. <br /> <br />Task 5.03.03 Costa Mesa Segment <br />. This Task covers the neighborhood fit study for the general area of Costa Mesa <br />Segment, which extends from Bristol/Sunflower through Anton to Main Street and SR- <br />55 Freeway. <br /> <br />Task 5.03.04 Irvine Business Center/Airport Segment <br />. This Task covers the neighborhood fit study for the general area of Irvine Business <br />Center/Airport segment, which extends from SR-55 Freeway/Main St. to San Diego <br />Creek and Michelson with option to UCI Campus. <br /> <br />Task 5,03,05 San Diego Creek Corridor <br />. This Task covers the neighborhood fit study for the general area of the San Diego Creek <br />Corridor, which extends from San Diego Creek/Michelson to San Diego Creek/Sand <br />Canyon. <br /> <br />Task 5.03,06 Irvine Spectrum/Transportation Center Segment <br />. This Task covers the neighborhood fit study for the general area of the Irvine <br />Spectrum/Transportation Center Segment, which extends from San Diego Creek/Sand <br />Canyon to the Irvine Transportation Center. <br /> <br />23 <br /> <br /> <br />- <br />--~ <br /> <br />,/\ <br />(Çè <br /> <br />