My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOYLE ENGINEERING 1 - 2005
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
BOYLE ENGINEERING 1 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2018 12:10:49 PM
Creation date
3/28/2005 3:19:41 PM
Metadata
Fields
Template:
Contracts
Company Name
Boyle Engineering Corporation
Contract #
A-2005-025
Agency
Public Works
Council Approval Date
2/7/2005
Insurance Exp Date
12/31/2005
Destruction Year
2012
Notes
Amended by A-2005-025-01; termination slip 12/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sample Scope of Services-continued <br /> <br />Task 5 - Base Sheet Preparation <br /> <br />Base plans of the project site will be prepared at the appropriate scale in AutoCad format, and final plans will be <br />provided to the City on disks. Base plans will display existing topographic features and accumulated data <br />including street centerlines and right-of-ways, surface features, stationing, and existing utilities. <br /> <br />Task 6 - Utility Research and Coordination <br /> <br />A detailed research and utility investigation of the project site will be conducted. This will include the <br />investigation of available records for data needed to avoid design cont1icts. Available plans for City-owned <br />utilities will be obtained. Notices will be sent out to utility companies known to be present within the project <br />limits requesting utility locations, atlases, and maps. A project log of all utilities will be generated showing the <br />status of each information request. The log will be updated during the life of the project. Upon completion of the <br />preliminary design, a second utility notice will be issued requesting verification of facilities and required <br />coordination of anticipated relocation or protection of existing facilities. Final improvement plans will be <br />transmitted to all utility companies, whose facilities are within the project site, informing them of the anticipated <br />bidding period. anticipated construction schedule, pre-construction meeting, and proposed timeframe of any <br />relocations required of them. <br /> <br />Task 7 - Concept Approval <br /> <br />For a project requiring further definition of the proposed improvements prior to initiating the design phase, a <br />concept approval phase will be used to achieve consensus. The concept approval may consist of geometric <br />approval drawings, a project definition letter report or project report, identifying specific amenities and <br />anticipated costs. <br /> <br />Task 8 - Outside Agency Coordination <br /> <br />Agencies outside the jurisdiction of the City that will be involved with the project will be identified. Points of <br />contact and lines of communications with each will be established at the outset of the project. Concurrence of <br />these agencies regarding design, permitting, and review periods will be obtained. Some of these agencies may be <br />aCTA, Caltrans, and/or Orange County Public Works. <br /> <br />Task 9 - Preliminary Design <br /> <br />Preliminary design will be performed based on information obtained from the above Tasks. As applicable, <br />hydrology and drainage studies will be performed, and traffic analyses will be conducted for the main <br />intersections. Also geotechnical studies and pavement design recommendations will be made. Landscaping will <br />include recommendations for median treatment including the irrigation system. Preliminary plans, conceptual <br />exhibits. and a preliminary cost estimate will be prepared. The development of initial work will be coordinated <br />regularly with City staff so that there are no "surprise recommendations" on this project. A preliminary design <br />package will be compiled and submitted to the City for review and approval. Prints of the preliminary plans will <br />be sent to all affected utility companies and agencies. <br /> <br />Task 10 - Traffic Signal <br /> <br />Provide plans for signal modifications as necessary in accordance with the improvements to the roadway. <br /> <br />Task 11 - Stormwater Pollution Prevention Plan (SWPPP) <br /> <br />Provide a performance specification for the contractor to develop a draft Storm Water Pollution Prevention Plan. <br />After completion by the contractor, the draft permit will be submitted for approval to Boyle. <br /> <br />20f4 <br /> <br />ISOVLE <br /> <br />04/11-061-062-0C-PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.