Laserfiche WebLink
Santa Ana Bridge Rehabilitation and Bike Trail Structure 12/27/2004 <br />TASK 3.2: PRE -APPLICATION FIELD MEETING <br />If desired by the ACOE, RWQCB and/or CDFG, RBF will conduct a pre -application <br />meeting to discuss proposed project with the agencies staff. It is assumed that only one <br />field meeting will be conducted and that all three (3) bridges will be visited the same day. <br />This meeting will facilitate the processing of the permits by allowing the resource <br />agencies to comment on the proposed project prior to submitting the applications. <br />TASK 3.3: ARMY CORPS OF ENGINEERS 404 PERMIT APPLICATION <br />Prepare submittal package for an Army Corps of Engineers 404 Permit to satisfy the <br />requirements of Section 404 of the Clean Water Act. It is assumed that, based upon <br />conceptual project plans, the proposed activities can be permitted under Nationwide <br />Permit No. 14, Linear Transportation Projects. The submittal package will include: (a) <br />404 permit application, (b) vicinity map, (c) project description, (d) jurisdictional <br />delineation map, and (e) site photos. It is anticipated that it will take two (2) to four (4) <br />months to process this application. This time frame is dependent on issuance of a water <br />quality certification by the Regional Water Quality Control Board. <br />TASK 3.4: CA DEPARTMENT OF FISH AND GAME 1 600 PERMIT APPLICATION <br />RBF will prepare an application submittal package for the CDFG 1602 Streambed <br />Alternation Agreement. The submittal package will include: (a) Form FG 2023, (b) <br />vicinity map, (c) project description, (d) jurisdictional delineation map, and (a) site <br />photos. This task does not include the permit filing fee, which can range up to $1,390.50 <br />depending on the construction cost of the proposed project. <br />TASK 3.5: REGIONAL WATER QUALITY CONTROL BOARD SECTION 401 <br />WATER QUALITY CERTIFICATION <br />RBF will prepare a submittal to secure a 401 Water Quality Certification from the State <br />pursuant to Section 401 of the Clean Water Act. This certification is necessary prior to <br />the ACOE concurring with discharges of fill material under their permit process. This task <br />does not include the permit filing fee, typically $500 per bridge. <br />TASK 3.6: RESOURCE AGENCY PERMIT PROCESSING <br />Provide regulatory services for the processing of the permits to the Army Corps of <br />Engineers, the California Department of Fish and Game, and the Regional Water Quality <br />Control Board. The processing shall include required correspondence or telephone calls <br />between the reviewing staff related to the permit or points of clarification. <br />TASK 4 - 60% PS&E UNCHECKED DETAILS <br />The 60% design will not commence until WKA is given the notice to proceed. This <br />notification is predicated on the City obtaining approval from the Caltrans District Local <br />Assistance that the environmental documents have been approved per Caltrans Local <br />Assistance Procedure Manual. The bridge design will have prepared in accordance with <br />the codes and standards of Caltrans. The following list summarizes the key design <br />