Laserfiche WebLink
Santa Ana Bridge Rehabilitation and Bike Trail Structure 12/27/2004 <br />Suggested Work Days schedules will be prepared for the individual structures, as well as <br />for the group of structures to be advertised and constructed in single phase. The <br />Standard Specifications for Public Works, "Greenbook", will be the basis of the project <br />specification and supplemented by sections of the Caltrans Standard Specification for <br />the bridge work. We will develop a project specification based on the Greenbook and <br />Caltrans Standard Special Provisions (SSP) in English format. <br />The WKA Team will submit the Initial Structure Plans to the City of Santa Ana, Caltrans, <br />County of Orange Flood Control District, and UPRR, and County of Orange Harbor <br />Beaches & Parks where applicable, for review and approval. This stage of the submittal <br />will include the following: <br />• Bridge Plans <br />• Standard Special Provisions <br />• Quantity and Initial Engineers estimates <br />DELIVERABLES: 90% PLANS, SPECIAL PROVISIONS AND ESTIMATES <br />DESIGN CALCULATIONS <br />CHECK CALCULATIONS <br />CHECK DETAIL COMMENTS AND RESOLUTIONS <br />TASK 6 - 100% PS&E <br />The WKA Team will collect all the comments on the initial PS&E from the City and from <br />Caltrans, and other reviewing agencies that issue permits for construction of the bridge <br />and the relocation of utilities. We will respond the comments with written resolution <br />letters that describes the method of dispositions of all comments. Revisions to the initial <br />PS&E submittals will be made after the proposed dispositions are approved by the <br />reviewers. The PS&E packages will be re -submitted to Caltrans for final review and <br />approval. <br />DELIVERABLES: gb% PLANS, SPECIAL PROVISIONS AND ESTIMATES <br />REPONSES TO REVIEW COMMENTS <br />TASK 7 - FINAL PS&E SUBMITTAL <br />The final approval submittal will implement the design corrections as noted in the <br />agency's review and our response comments. We will also produce our final Engineers <br />Estimates as part of the final PS&E Submittal. We will also prepare the final RE pending <br />files in accordance with Caltrans OSFP I&P Guides. <br />All structure plans will be submitted to Caltrans both in hardcopy format, and electronic <br />format. All plans will be prepared in DGN formats following Caltrans structure CAD <br />preparation guidelines. RE pending files will be prepared in accordance with Caltrans <br />MTD requirement, including the quantity summary sheets, , final approved foundation <br />report, , and construction notes to RE. <br />DELIVERABLES: FINAL 100% PS&E SUBMITTAL <br />RE PENDING FILES <br />TASKS - POST DESIGN SERVICES <br />