My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. Koo & Associates 3
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
W. Koo & Associates 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:51:18 PM
Creation date
3/30/2005 4:38:01 PM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates, Inc.
Contract #
A-2005-012
Agency
Public Works
Council Approval Date
1/18/2005
Expiration Date
12/31/2005
Insurance Exp Date
9/30/2009
Destruction Year
2016
Notes
Amended by A-2005-012-01, -02
Document Relationships
W. Koo & Associates 3a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
W. KOO & ASSOCIATES 3B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Bridge Rehabilitation and Bike Trail Structure 12/27/2004 <br />The WKA Team will conduct post design services (PDS) during the construction of the <br />structures. <br />The post design services include the following activities: <br />1. Attend pre -construction meeting <br />2. Respond to Request for Information (RFI) generated by the Construction <br />Manager <br />3. Review shop drawings as required by the engineer -of -record per Caltrans <br />Standard Specification. <br />4. Produce As -Built plans <br />WKA will provide other PDS at the request of the City or the Construction Manager. The <br />services will be provided on an hour and material basis as agreed by the City of Santa <br />Ana. <br />Exclusions <br />The following items are no included as part of this scope and fee: <br />1. Utility coordination <br />2. RR Coordination <br />3. Geotechnical report for Flower Street over Santiago Creek <br />4. Geotechnical Field Investigation & Laboratory Testing at all four locations. <br />5. Topographic surveys and surveys for centerline tie at all four locations. <br />6. Roadway survey on McFadden <br />7. The Bike Trail structure is assumed to be the cantilever slab alternative, thus <br />hydraulic analysis of the Santa Ana -Delhi Channel is not required. <br />8. CEQA & NEPA documents for Flower Street Bridge Rehabilitation <br />
The URL can be used to link to this page
Your browser does not support the video tag.