Shannon t Willits, PE
<br />Civil Engineer— Street Improvements
<br />Areas of Expertise Mr. Willits has more than 12 years experience in infrastructure project
<br />development and construction. He has managed large scale, complex
<br />♦ Infrastructure Project transportation programs through governmental agencies addressing
<br />Development & public and private concerns to deliver projects on schedule and within
<br />Construction budget, evaluated contract opportunities, developed pursuit strategies,
<br />lead proposal development, and maintained client interfaces.
<br />Education
<br />M.B.A./1998/LJniversiry of
<br />Representative Experience
<br />California -Irvine Laguna Niguel/Mission Viejo Commuter Rail Station, OCTA,
<br />Orange County, CA. Project Manager responsible for preparing
<br />B.S. vil Engineering, PS&E for $5M station project. Lead multidiscipline team to
<br />UniveersityrsityCiof California -Irvine develop station plaza and platforms, pedestrian underpass, track
<br />B.A./1990/Economics, realignment, local roads, parking facilities, channel improvements,
<br />University of California -Irvine waterline relocation, and landscaping. Key interfaces included
<br />J OCTA, SCRRA/Metrolink, City of Laguna Niguel, Orange County
<br />Registration PF&RD, MNWD, and Caltrans.
<br />Professional Engineer,
<br />State Route 210 - Segment 7 (City of Fontana), SANBAG, CA.
<br />California, No. 54730
<br />Segment Manager responsible for the development of this new
<br />Professional Affiliation
<br />$24M freeway project from inception through construction.
<br />Prepared the Project Report and secured GAD approval. Major
<br />American Society of Civil
<br />project phases included preliminary engineering and environmental
<br />- Engineers
<br />approval, preparation of PS&E, preparation of right of way maps,
<br />and oversight of construction. Project elements included 2.2 miles
<br />Years Experience
<br />of new eight -lane freeway, two interchanges, four grade separations,
<br />_ ___
<br />-
<br />URS_
<br />_ . __ two parallel: frontage roads, and parallet flood control_channel, _I€e}r-
<br />_
<br />,1
<br />R
<br />included €`.al ternsz�ictt. `i. of F+, _.
<br />-
<br />Sar} $erstarclzrt�7 . C€ i Ff o r Dist t, . _ cad_ tom
<br />ss •#
<br />_.� rare R,e Zi€?.—eeiiE� - -
<br />__ -_Srgmrsic..IAanager respctm sk_€cii z to evc ogf sent a tltr -nem -
<br />_
<br />$30M freeway project -.from -inception through -'early lire {
<br /><;
<br />_
<br />construction and mainlineclevelcipuiene:?rcpared`tt=
<br />----
<br />Project Report. ciiajar.project plsases zncicecl = prehr>arg
<br />—
<br />engineering `. and environtnenta"l 74M pepaeat> ' Of
<br />m-pirarion ofPS&E. ani i nciir {iY3'fiid I - _
<br />elements included 1.5 miles of new eight -lane freeway with an
<br />eastbound truck climbing lane, one interchange, two grade
<br />separations, major storm drain replacements, and major MWD
<br />crossing. Key interfaces included Caltrans District 7 & 8, FHWA,
<br />City of Upland, Los Angeles and San Bernardino County Flood
<br />Control Districts, Pomona Valley Protective Association,
<br />Metropolitan Wate- District, and local utility purveyors.
<br />• State Route 210 - Segments 10 & 11 (Cities of Rialto & San
<br />Bernardino), SANBAG, CA. Area Manager responsible for the
<br />development of these planned $108M freeway segments.
<br />Responsibilities included alignment alternatives, phasing strategies,
<br />interim improvements, study reports, and agreements. Project
<br />URS Y12001-Proposals\City of Santa Ana On -Call Engeering\resumesMilets, Shannon doc
<br />
|