Laserfiche WebLink
Shannon T. Willits, PE <br />Civil Engineer— Street Improvements <br />elements included 4.8 miles of new eight -lane freeway, five <br />—interchanges (including freeway -to -freeway), over 20 grade <br />separations, and several local road realignments and improvements. <br />• State Route 180 — Segment 4, FCTA, CA. Project Manager <br />responsible for preliminary engineering including geometric <br />approval drawings and preparation of right of way maps and <br />acquisition documents for 20 km of new 4 -lane expressway. Tasks <br />also include property base mapping and survey, right of way <br />engineering, mapping, and legal descriptions with Caltrans <br />oversight. <br />• South Highland Avenue (City of Fontana), SANBAG, CA. <br />Segment Manager responsible for the development of this new $6M <br />four -lane arterial. Responsibilities included alignment alternatives, <br />two-lane interim improvements, environmental, PS&E, right of <br />way mapping and acquisition of 87 parcels, and cooperative <br />agreements. <br />• State Route 34 (Lewis Road) Widening, County of Ventura, <br />CA. Project Manager for the preparation of the Project Report for <br />widening 1.3 km of State Route 34. The project entails outside <br />widening from two to four lanes, includes widening of a railroad <br />overhead, and interface with ongoing development of adjacent <br />roadway segments/projects. Key interfaces include Caltrans, <br />Ventura County Public Works Agency, Ventura County <br />i. _. Transportation -Authority,. and the Ciry-ofCan=iIlo s;. <br />1_8 idir ng C Ly <br />fdoipark _Project araeFs�lale ..for prepaTitg� - <br />..— <br />_c7rtcepf.risfIigrssrzer>I _ <br />_ _ 'snc� . rezvtcchzuca nvcsigano>ii - GL 2tifs nut$'e'J.,` s <br />a,s <br />_ wi&rdng from four to si_Y Lanes of 1.2 km -4 -Stare Highway. Ked <br />irnterfaces include Caltrans, City of -Moorpark. and :local uiaii , <br />purveyors. - - <br />• State Route I34/Ctentral Avenue, ol'Gtendae _CA� - - <br />r � ._ _ . _ r , Prect <br />.�na�-responsible ssible for preparing PEER <br />gni E of the Cen ra <br />Avenue eastbound off ramp. Project features include retaining <br />walls, signals, landscape replacement, and tight right of way. <br />• Sierra Avenue/SR 210, Fontana, CA. Prepared study report that <br />considered multiple interchange configurations that included <br />compact diamond, spread diamond, and partial cloverleaf. <br />Evaluated traffic, right-of-way, frontage road compatibility, <br />development objectives, environmental impacts, and construction <br />costs. _ <br />Y \2001-Proposals\Crty of Santa Ana On -Call Engccring\resurncs\Willcts. Shannon doc <br />