Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />MacArthur Place South Findings and Facts in Support of Findings <br />Environmental Impact Report <br /> <br />The proposed project would be required to contribute a fair share of funds for improvements to <br />the Northbound SR-55 On-Ramp to reduce potentially significant impacts to a level considered <br />less than significant. However, at this time there is no specific funding program or time frame to <br />implement the improvements. Because of the uncertainty then the improvements would occur, <br />the impacts to the Northbound SR-55 On-Ramp would be considered an unavoidable significant <br />impact. <br /> <br />Level of Significance ofImpacts Related to Impacts To The State Route SR-55 Northbound On <br />-Ramp At MacArthur Boulevard. <br /> <br />The project traffic impacts at the SR-55 Northbound On-Ramp at MacArthur Boulevard cannot <br />be mitigated to below a level of significance. <br /> <br />4.1.5.3 Cumulative Impacts Related to Southbound State Route SR-55 Southbound On-Ramp At <br />MacArthur Boulevard <br /> <br />As described in Section 5. I I in the EIR, the long-term operation of the MacArthur Place South <br />project would result in significant adverse cumulative traffic impacts at the SR-55 Southbound <br />On-Ramp at MacArthur Boulevard. <br /> <br />Finding Related to Cumulative Impacts To The SR-55 Southbound On-Ramp at MacArthur <br />Boulevard <br /> <br />Specific economic, legal, social, technological or other considerations make infeasible the <br />mitigation measures or project alternatives identified in the Final EIR to reduce unavoidable <br />significant cumulative impacts to a level that would be less than significant. <br /> <br />Facts in Support of the Finding Related to Cumulative Impacts To The State Route SR-55 <br />Southbound On-Ramp At MacArthur Boulevard <br /> <br />The proposed project would be required to contribute a fair share of funds for improvements to <br />the Southbound SR-55 On-Ramp to reduce potentially significant cumulative impacts to a level <br />considered less than significant. However, at this time there is no specific funding program or <br />time frame to implement the improvements. Because of the uncertainty then the improvements <br />would occur, the cumulative impacts to the southbound SR-55 On-Ramp would considered an <br />unavoidable significant cumulative impact. <br /> <br />Level of Significance ofImpacts Related to Impacts To The SR-55 Southbound On-Ramp At <br />MacArthur Boulevard. <br /> <br />The cumulative traffic impacts at the SR-55 Southbound On-Ramp at MacArthur Boulevard <br />cannot be mitigated to below a level of significance. <br /> <br />4.1.5.4 Cumulative Impacts Related to State Route SR-55 Northbound On-Ramp At MacArthur <br />Boulevard <br /> <br />Exhibit B <br />Page 13 of 38 <br /> <br />Page 13 <br />