Laserfiche WebLink
<br />MacArthur Place South Findings and Facts in Support of Findings <br />Environmental Impact Report <br /> <br />and associated structures to be left on the project site from damage. <br /> <br />U-6 Prior to issuance of grading permits, the project developer shall demonstrate to the City <br />of Santa Ana that construction-related waste generated on-site would be recycled <br />wherever feasible as the first choice of disposal method, leaving the option of landfill <br />disposal as a last alternative. The proposed commercial uses shall incorporate facilities <br />for collection and pick-up of recyclable materials into the design of the project. <br /> <br />U-7 Prior to issuance of grading permits, the project developer shall coordinate with the Santa <br />Ana Water Division to determine the exact location of all existing underground water <br />supply facilities and take action to prevent damage to these facilities to be left on the <br />project site or interfere with their operation. The project developer shall pay their fair <br />share amount for the necessary facilities to accommodate project-related water supplies. <br /> <br />U-8 Prior to issuance of building permits, the existing 8-inch sewer line along Hutton Centre <br />Drive, north of Sandpointe A venue shall be replaced with a new IO-inch sewer line. <br /> <br />U-9 Prior to issuance of grading permits, the project developer shall coordinate with Waste <br />Management on the type and location of facilities needed to provide solid waste disposal <br />service to the project site. <br /> <br />Level of Significance ofImpacts Related to Utilities and Service Svstems <br /> <br />The adverse impacts of the MacArthur Place South project related to utilities and service systems <br />would be mitigated to below a level of significance based on implementation of measures U-I, <br />U-2, U-3, U-4, U-5, U-6, U-7, U-8 and U-9. <br /> <br />4.3 IMPACTS FOUND NOT TO BE SIGNIFICANT OR LESS THAN SIGNIFICANT <br /> <br />The City finds that, based on substantial evidence in the record, discussed below, the following <br />impacts associated with the MacArthur Place South project are less than significant and no <br />mitigation is required. Additionally, the City finds, as set forth in Sections 4.1 (Potentially <br />Significant Adverse Impacts of the City Place Project Which Cannot Be Mitigated to Below a <br />Level of Significance) and 4.2 (Potentially Significant Adverse Impacts of the City Place Project <br />Which Can Be Mitigated to Below a Level of Significance), above, no other potentially <br />significant adverse project specific impacts of the proposed project are anticipated to occur. <br /> <br />An Initial Study (IS) was completed at the beginning of the environmental review process for the <br />proposed project, to identify those impacts that could be potentially significant and adverse and <br />which required further study in an EIR. The IS also provided analysis on the environmental <br />impacts of the project that were determined to be less than significant due to the identification <br />and incorporation of mitigation early in the process or based on compliance with existing <br />regulations. The findings of the IS are summarized in Section 2.7 (Effects Found Not to be <br />Significant) in the ElR. <br /> <br />The EIR and IS determined, based on substantial evidence in the record, that the following <br /> <br />Exhibit B <br />Page 28 of 38 <br /> <br />Page 28 <br />