My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-099 - Overriding Considerations for the Alton Avenue Overcrossing at the SR-55 Freeway Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-099 - Overriding Considerations for the Alton Avenue Overcrossing at the SR-55 Freeway Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 12:08:46 PM
Creation date
10/26/2005 11:52:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-099
Date
10/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Draft Findings of Fact and Mitigation Monitoring Reporting Program (applies to CEQA only) <br /> <br />2.0 PROJECT DESCRIPTION <br /> <br />The proposed action wnuld include the construction of an overcrossing on Alton <br />AvenuelParkway with high-occupancy vehicle (HOY) direct access drop ramps over connecting <br />to SR-55, addition of a signalized intersection with the HOV ramps, widening the SR-55 to <br />accommodate median ramps, widening Alton Avenue, relocating an existing drainage channel, <br />relocating two sections of Pullman A venue, widening the Dyer Road undercrossing structure, <br />and modifying existing ramps at MacArthur Boulevard and Dyer Road to connect with the <br />widened freeway. Overcrossing improvements are within the existing Caltrans right-of-way and <br />the Cities of Santa Ana and Irvine. Some property acquisitions would be needed to widen Alton <br />Avenue to accommodate two travel lanes in each direction, dedicated left turn lane, and <br />sidewalks. The proposed improvements would conform to Caltrans design standards but would <br />require some design exceptions for non-standard features. The project has been assigned the <br />Project Development Processing Category 3 because it would provide a new freeway connection <br />and would require widening of the freeway. <br /> <br />The total estimated construction cost for the proposed build alternative is $83.4 million dollars. <br />The project would receive funding from the City of Santa Ana, the City of Irvine, and the Orange <br />County Transportation Authority (OCT A). This project is programmed for funding in the 2002 <br />State Transportation Improvement Program (STIP), the Final 2002 Regional Transportation <br />Improvement Program (RTIP FY 2004/2005-2009/2010), and the approved Capital Improvement <br />Programs for the Cities of Santa Ana and Irvine. <br /> <br />Resa~~e~2i.g at SR-55 <br />Page 14 of 49 <br /> <br />K-2 <br /> <br />April July 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.