My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-099 - Overriding Considerations for the Alton Avenue Overcrossing at the SR-55 Freeway Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-099 - Overriding Considerations for the Alton Avenue Overcrossing at the SR-55 Freeway Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 12:08:46 PM
Creation date
10/26/2005 11:52:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-099
Date
10/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Draft Findings of Fact and Mitigation Monitoring Reporting Program (applies to CEQA only) <br /> <br />limited to, changing the location of stationary construction equipment, shutting off <br />idling equipment, rescheduling construction activity, notifying adjacent residents in <br />advance of construction work, or installing acoustic barriers around stationary <br />construction noise sources. <br /> <br />NOI-3 <br /> <br />A noise barrier is recommended to be included in the project for Site 3 (as described <br />in the FEIRIEA) and will be subject to the property owner's concurrence. <br /> <br />With Mitigation the Effects are Found to be: <br /> <br />() Significant (x) Not Significant <br /> <br />Finding: <br /> <br />1. (x) Changes or alterations have been required in, or incorporated into, the project, which <br />avoid the significant environmental effect. (Subd. [a][I].) <br /> <br />2. () Such changes or alterations are within the responsibility and jurisdiction of another public <br />agency and not the agency making the finding. Such changes have been adopted by such <br />other agency or can and should be adopted by such other agency. (Subd. [a][2].) <br /> <br />3. ( ) Specific economic, legal, social, technological, or other considerations, including <br />provision of employment opportunities for highly trained workers, make infeasible the <br />mitigation measures or project alternatives identified in the Final EIRIEA (Subd. [a][3].) <br /> <br />Rationale: Implementation of these mitigation measures will reduce noise impacts to levels less <br />than significant by ensuring minimization of short-term construction-related noise and <br />implementation of a noise wall barrier at Site 3. No further mitigation is required. <br /> <br />Reference: The discussion on setting, impacts, and mitigation related to Noise are included in <br />Section of the FEIR/EA prepared for the Alton Avenue Overcrossing at SR-55. <br /> <br />7.6 BIOLOGICAL RESOURCES <br /> <br />Potentially Significant Effects <br /> <br />Permanent Impacts - None <br /> <br />Temporary Impacts (Construction) <br /> <br />. Construction activities associated with the Preferred Alternative may promote the spread of <br />invasive plant species. Equipment operating within the study area where invasive species are <br />already present would likely spread the species to other areas where construction would <br />occur, or to areas where the equipment would be cleaned. <br /> <br />Mitigation: The City shall implement the following mitigation measures prior to and during <br />construction: <br /> <br />Alton Avenue Overcrossing at SR-55 <br /> <br />K-21 <br /> <br />Resoluti<llPNw~ilfiJ:!)99 <br />Page 33 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.