Laserfiche WebLink
<br />SANTA ANA, CALIFORNIA, FIRE DEPARTMENT <br /> <br />REMOTE AccESS ,. PROPOSAL <br /> <br />c When multi-address locations exist, such as apartments or strip malls that have <br />the same base address but several apartments or suite numbers, Group 1 will <br />create a single Company Record for the lowest numbered or base address and <br />link to the Company Record all of the converted drawings (Site Plan, First Floor, <br />etc.) for that address. It is typical that the Department will perform the additional <br />linking operations after the initial installation and training has been completed. <br />Group 1 can perform additional linking in these cases, but the costs for the <br />additional links are not included in this proposal. <br /> <br />Note - During linking operations done by Group 1, all updates done by the Department will <br />be stopped to ensure accuracy of data, Group 1 will coordinate these efforts with the <br />Department during the linking process, <br /> <br />. Delivery of the converted drawing files will be done via Group 1 's FTP site or CD via <br />ground based delivery, <br /> <br />2.2. Quality Control Methods <br /> <br />Group 1 has implemented Quality Control (QC) methods within our digitizing process. <br />QC is an approach that emphasizes doing the job right the first time so that information <br />missed or entered erroneously is immediately identified and corrected. Not having to re- <br />enter data or go back and enter data twice saves time and allows Group 1 to keep our <br />costs the lowest possible. The results of QC are evident in the quality of the digitization <br />on the first submission and an aggressively short duration to produce the result. <br /> <br />Group 1 maintains quality through several levels of data entry, checking and <br />management. The Data Entry Specialist begins by converting the data directly from the <br />hard copy drawing or raster file submitted by the client. For every data element entered <br />into the drawing file, the corresponding element on either the original hard copy or raster <br />check plot is checked to verify completion. <br /> <br />The final drawings are reviewed by the Production Manager to ensure that the standards <br />established have been adhered to during conversion. If a drawing is found to not <br />conform to the established standards, it is returned and corrected before delivery to the <br />client. <br /> <br />Other levels of management are responsible for many elements that contribute to <br />quality, such as accurate staffing levels, thorough educational programs, maintaining the <br />best, most productive hardware and current levels of software, and creating an <br />environment of employee empowerment. <br /> <br />In addition to these internal Group 1 steps, we will work closely with the Department to <br />create a quality review program to assess the accuracy of converted preplans upon their <br />return to the Department. <br /> <br />...:).,GROUP 1 SOLUTIONS, INC, @ <br /> <br />PAGE 8 OF 25 <br />