My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TSCM CORPORATION 4B - 2005
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY PRIOR TO 2017
>
TSCM CORPORATION 4B - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:02:05 PM
Creation date
1/9/2006 4:27:52 PM
Metadata
Fields
Template:
Contracts
Company Name
TSCM Corporation
Contract #
A-2005-268
Agency
Community Development
Council Approval Date
11/7/2005
Expiration Date
12/31/2006
Insurance Exp Date
1/1/2007
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.5 The City reserves the right to order cleaning in specific areas. Areas shall be <br />cleaned in any combination or sequence as determined by the Executive Director <br />of the Community Development Agency or her designee. <br />1.6 The City will provide the water necessary to complete the cleaning of the <br />sidewalks. <br />1.7 All work shall be performed between the hours of 10:00 p.m. and 6:00 a.m., daily <br />five (5) days per week. The work schedule must be coordinated with the <br />Executive Director of the Community Development Agency or her designee. <br />1.8. Processes used by the Contractor shall leave the area clean and free of stains and <br />all loose or embedded materials, including chewing gum. The Contractor shall <br />remove all debris from the area; all water shall be captured using zero-dischazge <br />technique and removal of all affluent from the sidewalks. The cleaning process <br />shall not damage the concrete surfaces or the brick paver surface. The process <br />shall not damage adjacent areas in any wa}~. The contractor will be responsible for <br />al] damage to the surrounding areas. <br />1.9 The City reserves the right to suspend the work wholly or in part if deemed <br />necessary for the best interest of the City. This suspension will be without <br />compensation to the Contractor, other than to adjust the contract completion / <br />delivery requirements. <br />1.10 Contractor shall timely perform the services required by this Agreement. Delays, <br />if due to no fault or neglect of the Contractor, may entitle the Contractor to an <br />extension of time allowed for completing the work. Contractor must notify the <br />City of any such delay. <br />1.11 The Contractor, shall each morning remove all supplies, materials, debris, <br />rubbish, etc. caused by the operation and leave the finished site in a neat, orderly <br />condition. All walls and glass door entries shall be free of dirty water and/or mud <br />stains. <br />1.12 All sidewalk gutters must be cleaned of all gum and other debris and substances. <br />1.13 The cleaning process shall use hot water under high pressure for the most <br />effective cleaning. The temperature of the water is to be 250*F minimum. <br />1.14 All gum must be removed from the pavers, concrete and other sidewalk surfaces. <br />I.15 Pressure washing shall include the areas behind the sidewalk benches, bus stop <br />areas, and other structures located on the outside of the buildings on the sidewalk, <br />1.16 Bus stop areas are to be cleaned of all debris, gum, dirt and grime. <br />
The URL can be used to link to this page
Your browser does not support the video tag.