My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ a. <br /> b. <br /> c. <br /> d. <br /> e. <br /> <br />\.... <br /> <br />'-' <br /> <br />Exhibit A: Statement of Work <br /> <br />Santa Ana shall: <br /> <br />Provide, upon request, currently existing information, data, records, and documents and make <br />such design decisions as are reasonably required to document changes necessary for the <br />Positron applications. <br /> <br />Provide detailed specifications and definitions for all interfaces to non-Positron systems. <br /> <br />Ensure that appropriate Santa Ana personnel are present and actively participating in scheduled <br />Requirements Validation meetings. <br /> <br />Review the Functional System Descriptions and Change List documents submitted by Positron <br />and identify in writing any specific deficiencies found within twenty (20) business days. <br /> <br />Address any issues regarding Change List deficiencies raised by Positron within ten (10) business <br />days. Exceptions to this term can be negotiated between the respective Project Managers at their <br />discretion. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when: <br /> <br />All issues related to tailoring and configuration has been resolved in written agreement between Santa Ana <br />and Positron in a single document. <br /> <br />Task 2: <br /> <br />Positron Base Software Installation <br /> <br />Objective: <br /> <br />Install and test all third party software, install base CAD application at SAPO facility. <br /> <br />Task Description: <br /> <br />During this phase, all applicable baseline CAD application software, as well as the vendor's operating <br />system software, necessary for this phase of the project to be completed, will be loaded on Santa Ana's <br />server equipment (located at SAPO facilities). <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Install the application software at SAPO. <br /> <br />b. Assist Santa Ana with coordinating the installation of software on any Santa Ana-owned hardware <br />that will be used to load baseline software (i.e., existing servers, laptops, etc.). <br /> <br />c. Install the baseline CAD licensed software within this configuration. <br /> <br />d. Teslthe initial operation of the baseline CAD subsystem and provide a status report to Santa <br />Ana's project manager upon completion. <br /> <br />e. Provide written certification of successful installation. <br /> <br />Santa Ana shall: <br /> <br /> <br />a. Be available to address and answer questions that arise during the installation of the baseline <br />CAD application software. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.