Laserfiche WebLink
<br />~ a. <br /> b. <br /> c. <br /> d. <br /> e. <br /> <br />\.... <br /> <br />'-' <br /> <br />Exhibit A: Statement of Work <br /> <br />Santa Ana shall: <br /> <br />Provide, upon request, currently existing information, data, records, and documents and make <br />such design decisions as are reasonably required to document changes necessary for the <br />Positron applications. <br /> <br />Provide detailed specifications and definitions for all interfaces to non-Positron systems. <br /> <br />Ensure that appropriate Santa Ana personnel are present and actively participating in scheduled <br />Requirements Validation meetings. <br /> <br />Review the Functional System Descriptions and Change List documents submitted by Positron <br />and identify in writing any specific deficiencies found within twenty (20) business days. <br /> <br />Address any issues regarding Change List deficiencies raised by Positron within ten (10) business <br />days. Exceptions to this term can be negotiated between the respective Project Managers at their <br />discretion. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when: <br /> <br />All issues related to tailoring and configuration has been resolved in written agreement between Santa Ana <br />and Positron in a single document. <br /> <br />Task 2: <br /> <br />Positron Base Software Installation <br /> <br />Objective: <br /> <br />Install and test all third party software, install base CAD application at SAPO facility. <br /> <br />Task Description: <br /> <br />During this phase, all applicable baseline CAD application software, as well as the vendor's operating <br />system software, necessary for this phase of the project to be completed, will be loaded on Santa Ana's <br />server equipment (located at SAPO facilities). <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Install the application software at SAPO. <br /> <br />b. Assist Santa Ana with coordinating the installation of software on any Santa Ana-owned hardware <br />that will be used to load baseline software (i.e., existing servers, laptops, etc.). <br /> <br />c. Install the baseline CAD licensed software within this configuration. <br /> <br />d. Teslthe initial operation of the baseline CAD subsystem and provide a status report to Santa <br />Ana's project manager upon completion. <br /> <br />e. Provide written certification of successful installation. <br /> <br />Santa Ana shall: <br /> <br /> <br />a. Be available to address and answer questions that arise during the installation of the baseline <br />CAD application software. <br /> <br />10 <br />