Laserfiche WebLink
<br />\or <br /> <br /> a. <br /> b. <br /> c. <br /> d. <br /> e. <br />'-1 f. <br /> <br />'-' <br /> <br />Exhibit A: Statement of Work <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when the primary CAD and third party application software has been <br />installed on the SAPO hardware and has been certified by Positron to be operational. <br /> <br />Task 3: <br /> <br />Geofile Installation/Training (Map maintenance) <br /> <br />ObJective: <br /> <br />Prepare Santa Ana map data for insertion into the Positron CAD environment. <br /> <br />Task Description: <br /> <br />Convert and install the initial City GIS Map into Positron CAD Application and train City GIS personnel in <br />the proper workflow to update the map and then insert the new map into the production environment. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />Identify the geometrical map needs and database structure necessary to run the POWER CAD <br />System. <br />Translate existing Santa Ana map data into the required Positron format. <br />Identify data Workflow and Map Validation routines. <br />Train Santa Ana GIS personnel how to utilize the identified workflow and Validation routines. <br />Train Santa Ana personnel to edit/update and insert a new map into the CAD environment. <br />Supply Santa Ana with standard documentation on the Map Update procedures. <br /> <br />Santa Ana shall: <br /> <br />a. Provide Positron with pilot map data. <br /> <br />b. Identify Santa Ana personnel from both the GIS Department and the Dispatch group that will act <br />as System Administrators who will have the ongoing responsibility for map creation/editing. <br /> <br />Completion Criteria <br /> <br />This task will be considered complete when the initial map has been inserted into the PosRron CAD <br />environment and Santa Ana personnel have been trained in the proper procedures for map updates and <br />inserting a updated map into the CAD environment. <br /> <br />Task 4: <br /> <br />CAD Configuration <br /> <br />ObJective: <br /> <br />Configure CAD for Santa Ana and provide instruction to Santa Ana on configuration <br />procedures. <br /> <br />Task Description: <br /> <br />Conduct all CAD software tailoring that is the responsibility of Positron based upon standard and ordinary <br />site-specific set up processes (i.e., modifying site-specific information such as headerslfooters, etc.). <br />PosRron will conduct a x-{!ay training course for designated Santa Ana personnel so Santa Ana personnel <br />acquire the knowledge necessary to enter all the data in the CAD database tables (incident types, status <br /> <br /> <br />11 <br />