Laserfiche WebLink
<br />Exhibit A: Statement of Work <br /> <br />specification and interface control documents. <br /> <br />~ <br /> <br />Task 6: <br /> <br />Deliver CAD Documentation <br /> <br />Objective: <br /> <br />Document and deliver the CAD Documentation described in Positron's Proposal to Santa <br />Ana, to include training guides, reference guides, configuration guides, system <br />administration manuals and related standard documentation supplemented by <br />documentation that wili support the user's utilization of the subsystem. <br /> <br />Task Description: <br /> <br />Should any site-specific changes be made to the CAD application foliowing Task 1, Positron will reflect <br />such changes into the baseline functional specification documentation. Positron wili also provide <br />documentation on completed CAD interfaces. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Prepare final CAD specification documents. <br />b. Supplement the interface control document, as required. <br />c. Provide a draft version of documents, with an opportunity for Santa Ana to identify any errors or <br />omissions. <br />d. Correct documentation within forty five (45) days (if necessary). <br /> <br />\... Santa Ana shali: <br /> <br />a. Review the CAD specification and interface control documents (described above) submitted by <br />Positron and identify in writing any specific errors and/or omissions found within twenty (20) <br />business days of receipt. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete upon Santa Ana's acceptance of the finalized CAD specification and <br />interface control documents, foliowing a review and correction process. <br /> <br />Task 7: <br /> <br />CAD Functional Testing <br /> <br />Objective: <br /> <br />Perform functional tests of CAD. <br /> <br />Task Description: <br /> <br />Demonstrate the applicable functions and features of CAD as defined in the CAD specification documents. <br />Santa Ana staff will perform functional testing of the CAD subsystem. <br /> <br />\w <br /> <br />a. <br /> <br />Utilize the Pos~ron RFP response and the system acceptance test plan as a guideline for ali CAD <br /> <br /> <br />Responsibilities: <br />Positron shali: <br /> <br />19 <br />