My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit A: Statement of Work <br /> <br />specification and interface control documents. <br /> <br />~ <br /> <br />Task 6: <br /> <br />Deliver CAD Documentation <br /> <br />Objective: <br /> <br />Document and deliver the CAD Documentation described in Positron's Proposal to Santa <br />Ana, to include training guides, reference guides, configuration guides, system <br />administration manuals and related standard documentation supplemented by <br />documentation that wili support the user's utilization of the subsystem. <br /> <br />Task Description: <br /> <br />Should any site-specific changes be made to the CAD application foliowing Task 1, Positron will reflect <br />such changes into the baseline functional specification documentation. Positron wili also provide <br />documentation on completed CAD interfaces. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Prepare final CAD specification documents. <br />b. Supplement the interface control document, as required. <br />c. Provide a draft version of documents, with an opportunity for Santa Ana to identify any errors or <br />omissions. <br />d. Correct documentation within forty five (45) days (if necessary). <br /> <br />\... Santa Ana shali: <br /> <br />a. Review the CAD specification and interface control documents (described above) submitted by <br />Positron and identify in writing any specific errors and/or omissions found within twenty (20) <br />business days of receipt. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete upon Santa Ana's acceptance of the finalized CAD specification and <br />interface control documents, foliowing a review and correction process. <br /> <br />Task 7: <br /> <br />CAD Functional Testing <br /> <br />Objective: <br /> <br />Perform functional tests of CAD. <br /> <br />Task Description: <br /> <br />Demonstrate the applicable functions and features of CAD as defined in the CAD specification documents. <br />Santa Ana staff will perform functional testing of the CAD subsystem. <br /> <br />\w <br /> <br />a. <br /> <br />Utilize the Pos~ron RFP response and the system acceptance test plan as a guideline for ali CAD <br /> <br /> <br />Responsibilities: <br />Positron shali: <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.