Laserfiche WebLink
details for non-standard improvements. The plan will include standard notes as required by <br />the approving agency. Earthwork calculations will be prepared to estimate the cut, fill and <br />import or export quantities. <br />Drainage Report (Hydrology/Hydraulics) — We anticipate that even for a small sites that the <br />agency will require at least an abbreviated drainage report. We will perform a hydrology <br />study of the site for pre- and post -construction conditions. Based on the finding of our <br />report, storm drain systems will be sized and connections to existing agency storm drains will <br />be recommended as necessary. Hydraulic calculations will be prepared to justify the storm <br />drain design. <br />Water Quality Management Plan (WQMP) — Per agency requirements, we will prepare a <br />WQMP. The WQMP will discuss the potential for contaminates entering the downstream local <br />drainage system and mitigation measures to minimize contaminates leaving the site. <br />Storm Water Pollution Prevention Plan (SWPPP) — As necessary, we will prepare a SWPPP to <br />cover the anticipated construction activities for the site. The SWPPP will discuss the potential <br />for sediment leaving the site and the mitigation measures required to reduce or eliminate this <br />from occurring. The appropriate BMPs will be included along with a monitoring program <br />during the course of construction. An erosion control plan will be developed and included <br />within the SWPPP. <br />Prepare Technical Specification Outline <br />• Site Component Specification <br />• Building Component Specification <br />• Fueling Station Specification <br />• Miscellaneous Equipment Specification <br />Prepare and Publish Final Design Development Package <br />Present Final Schematic Design Exhibits during Public Participation Workshop <br />Prepare Preliminary Cost — Order of Magnitude <br />Update Construction Schedule <br />3 <br />D <br />Prepare Building Design Development Drawings <br />Floor Plans <br />• <br />Reflected Ceiling Plans <br />Exterior Elevations <br />• <br />Interior Elevations <br />Building Sections <br />• <br />Roof Plans <br />Foundation Plans <br />• <br />Structural Framing Plans <br />HVAC System Layout Plan <br />• <br />Equipment Schedules <br />Plumbing System Layout Plan <br />• <br />Electrical Layout Plan <br />Establish Sustainable Practices to Achieve LEED Design Principles <br />Focus on Site, Building Materials, and Orientation <br />• <br />Explore Energy Efficient Lighting Options <br />Prepare Technical Specification Outline <br />• Site Component Specification <br />• Building Component Specification <br />• Fueling Station Specification <br />• Miscellaneous Equipment Specification <br />Prepare and Publish Final Design Development Package <br />Present Final Schematic Design Exhibits during Public Participation Workshop <br />Prepare Preliminary Cost — Order of Magnitude <br />Update Construction Schedule <br />3 <br />D <br />