My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-03-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
03/06/2006
>
FULL PACKET_2006-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 4:44:52 PM
Creation date
3/1/2006 11:46:59 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table A-1 <br />EMISSION THRESHOLDS OF SIGNIFICANCE <br />Long-term Operational Air Quality Impacts <br />The primary source of long-term operational emissions <br />associated with the proposed project would be generated by <br />vehicle travel to and from the project site. A relatively <br />minor amount of gaseous emissions would also occur from <br />natural gas and electricity usage. The proposed project is <br />consistent with the General Plan. The long-term operational <br />emissions generated by the proposed project would be <br />consistent with the air pollutant emissions projected <br />within the General Plan Land Use Element FEIR. <br />Short-term constructed Related Air Quality Impacts <br />Construction operations for the proposed project would <br />involve the grading of approximately 5,000 cubic yards of <br />soil and a limited amount of building construction. Given <br />the minimal amount of grading and construction activity, <br />less than significant construction related air quality <br />impacts are expected. However, dust generated from <br />construction operations could be a nuisance to nearby land <br />uses. To minimize dust impacts during construction, the <br />proposed project would be subject SCAQMD Fugitive Dust Rule <br />403. To insure compliance with Fugitive Dust Rule 403 the <br />following mitigation measure shall be implemented. <br />Mitigation Measure <br />• Grading plans and construction plans for the proposed <br />project shall reflect the following notes: <br />8 <br />3 �2 3 <br />Project <br />Pollutant <br />Construction <br />Tons/ <br />Operations <br />Pounds/Day <br />Quarter <br />Pounds/Day <br />Carbon Monoxide <br />550 <br />24.75 <br />550 <br />Reactive Organic <br />Compounds <br />75 <br />2.5 <br />55 <br />Nitrogen Oxides <br />100 <br />2.5 <br />55 <br />Particulate <br />Matter <br />150 <br />6.75 <br />150 <br />Long-term Operational Air Quality Impacts <br />The primary source of long-term operational emissions <br />associated with the proposed project would be generated by <br />vehicle travel to and from the project site. A relatively <br />minor amount of gaseous emissions would also occur from <br />natural gas and electricity usage. The proposed project is <br />consistent with the General Plan. The long-term operational <br />emissions generated by the proposed project would be <br />consistent with the air pollutant emissions projected <br />within the General Plan Land Use Element FEIR. <br />Short-term constructed Related Air Quality Impacts <br />Construction operations for the proposed project would <br />involve the grading of approximately 5,000 cubic yards of <br />soil and a limited amount of building construction. Given <br />the minimal amount of grading and construction activity, <br />less than significant construction related air quality <br />impacts are expected. However, dust generated from <br />construction operations could be a nuisance to nearby land <br />uses. To minimize dust impacts during construction, the <br />proposed project would be subject SCAQMD Fugitive Dust Rule <br />403. To insure compliance with Fugitive Dust Rule 403 the <br />following mitigation measure shall be implemented. <br />Mitigation Measure <br />• Grading plans and construction plans for the proposed <br />project shall reflect the following notes: <br />8 <br />3 �2 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.