My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-03-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
03/06/2006
>
FULL PACKET_2006-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 4:44:52 PM
Creation date
3/1/2006 11:46:59 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. All material excavated or graded will be <br />sufficiently watered to prevent excessive amounts <br />of dust. <br />2. All clearing and earthwork activities shall cease <br />during period of high winds (winds greater than <br />25 mph averaged over one hour) or during Stage 1 <br />or Stage 2 smog episodes. <br />3. Streets surrounding the project site should be <br />cleaned at the end of each day of construction. <br />4. All material transported offsite shall either be <br />sufficiently watered or securely covered to <br />prevent excessive amounts of dust. <br />S. Equipment engines shall be maintained in good <br />condition and in proper tune according to <br />manufacturer's specifications. <br />C. Result in a cumulatively considerable net increase of <br />any criteria pollutant for which the project region is <br />non -attainment under an applicable federal or state <br />ambient air quality standard? <br />Less Than Significant Impact <br />The proposed project would be consistent with the City's <br />General Plan and the local growth forecasts for the Orange <br />County sub region and regional emissions budget developed <br />by the Southern California Association of Governments for <br />the 1999 Air Quality Management Plan. SCAG has determined <br />that the air pollution impacts of any project that conforms <br />to local growth forecasts would be consistent with this <br />forecast and the regional air quality impacts would be <br />adequately mitigated by the Plan to a level considered less <br />than significant. The proposed project is consistent with <br />the General Plan and the South Coast Air Quality Management <br />Plan and therefore would not result in significant <br />cumulative air quality impacts. <br />D. Expose Sensitive receptors to substantial pollutant <br />concentrations? <br />Less Than Significant Impact <br />E <br />31,24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.