Laserfiche WebLink
Proposal to Prepare an EIR and Provide Planning Consulting Services for the <br />First and Fourth Street Corridors Mixed -Use Overlay Zone <br />■ Existing Traffic <br />■ Existing Traffic + Approved Projects <br />■ Existing Traffic + Approved Projects + Proposed Project <br />■ Cumulative Traffic (Existing Traffic + Approved Projects + Pending Projects) <br />■ Cumulative Traffic + Proposed Project <br />For any noise impacts that exceed identified significance thresholds, feasible mitigation measures <br />would be identified, which may include modification of construction techniques (subject to engineering <br />constraints and feasibility) or hours, changes in project design or layout, or provision of temporary or <br />long-term barriers to noise transmission. <br />Population, Housing, and Employment <br />Program Analysis <br />The project site is large enough to alter the population, employment, and housing characteristics of the <br />City. The MU Overlay Zone could increase the population of the City and result in a redistribution and/or <br />increase of the population of the county. The MU Overlay Zone would provide for a mix of residential <br />densities and employment -generating uses, so the EIR will report a jobs/housing ratio for the project <br />itself. <br />The EIR will summarize the employment and housing characteristics of the City, based on existing <br />documentation. Applicable General Plan policies regarding population, housing, and employment <br />opportunities will be described. The potential population increase associated with the MU zone will be <br />estimated based on the number and type of dwelling units proposed and the employment generation <br />will be estimated based on the proposed acreages and assumed floor area ratios (FAR) for <br />commercial, retail, industrial and public uses. The EIR will quantify the jobs/housing ratio for the City. <br />The EIR will evaluate the proposed residential densities to determine consistency with the General <br />Plan, including the Housing Element. <br />Proiect Analysis <br />EIP will evaluate impacts related to the demolition of any existing structures on the project sites. <br />Development of the two projects will result in changes in employment and population at the sites. <br />Impacts related to the displacement of existing businesses could result. The characteristics and <br />potential impacts will be evaluated, considering both direct and indirect effects. One project site is <br />vacant and the other currently contains commercial/office uses. These characteristics will be described. <br />Policies and forecasts pertaining to the population growth in the immediate area and greater City of <br />Santa Ana will be identified, including census data and forecasts developed by the City and the <br />Southern California Association of Governments (SCAG), including the Regional Housing Needs <br />Assessment. <br />The consistency of the projects with City and regional growth forecasts and policies will be evaluated. <br />In addition, any population generated resulting from implementation of the proposed projects as a <br />percentage of the City's overall growth allocation by SCAG, Department of Finance, and other sources <br />will be calculated. <br />Any measures to mitigate significant impacts will be identified and confirmed with City staff. <br />13 <br />