My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EIP ASSOCIATES 6
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
EIP ASSOCIATES 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:29:41 PM
Creation date
4/12/2006 1:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
EIP Associates dba Post, Buckley, Schuh & Jernigan, Inc. (PBS&J)
Contract #
A-2006-021
Agency
Planning & Building
Council Approval Date
2/6/2006
Insurance Exp Date
9/30/2007
Destruction Year
2012
Notes
Amended by A-2007-057
Document Relationships
EIP ASSOCIATES dba (PBS&J) POST, BUCKLEY, SCHUH & JERNIGAN, INC. 6A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to Prepare an EIR and Provide Planning Consulting Services for the <br />First and Fourth Street Corridors Mixed -Use Overlay Zone <br />21. Fruit Street at Mabury Street (unsignalized) <br />22. Fruit Street at Cabrillo Park Drive (unsignalized) <br />23. Fruit Street at Parkcenter Drive (unsignalized) <br />24. Wellington Avenue at Cabrillo Park Drive (unsignalized) <br />25. Wellington Avenue at Tustin Avenue (unsignalized) <br />City of Tustin Intersections <br />1. 1" Street at Yorba Street <br />2. 1" Street at B Street (unsignalized) <br />3. 15' Street at EI Camino Real <br />4. 1 s` Street at Prospect Avenue <br />5. 1s` Street at Centennial Way <br />6. 15` Street at Newport Avenue <br />7. 4`h Street (Irvine Boulevard) at Yorba Street <br />S. Irvine Boulevard at B Street <br />9. Irvine Boulevard at Prospect Avenue <br />10. Irvine Boulevard at Fashion Lane <br />11. Irvine Boulevard at Holt Avenue <br />12. Irvine Boulevard at Newport Boulevard <br />The counts will be taken by personnel of KOA or by a traffic count specialist, Traffic Data Services of <br />Santa Ana or The Traffic Solution of Arcadia, depending upon project scheduling and availability. Once <br />Task 3 is initiated, any additional counts that are needed will result in the fee being renegotiated. <br />Future traffic volume information will be obtained from the most recent version of OCTAM furnished by <br />OCTA. If the fee for their information exceeds $1,000, additional compensation will be requested by <br />KOA (the fee for existing forecasts is nominal). <br />KOA will also review the location and intersections in the field to observe and inventory roadway <br />geometries, existing traffic operation, and relevant information during peak hours. <br />Report Preparation <br />The study will address traffic conditions at all relevant intersections required by CEQA guidelines and <br />CMP guidelines. KOA will research information pertaining to approved projects and projects pending <br />approval in each study area from the affected agencies. <br />The report will include general recommendations related to circulation and accessibility to be utilized in <br />the design and implementation of the Mixed -Use Overlay Zone. The report will also analyze potential <br />parking intrusions into nearby business and residential neighborhoods as well as non-residential uses <br />generated by commuter or truck traffic through residential areas that might alter their residential <br />character. <br />KOA will prepare a traffic study for the development proposal. The study will present all information <br />prepared by KOA, including the following: <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.