Laserfiche WebLink
<br />-:'. <br /> <br />~~~~!ii~~'t~'~0)';:'; <br /> <br />v''j, <br />'r,.,!,. <br />Y:rH <br />"--,',,, <br />~'-'- - <br />,'f;, f;' <br />.~'~ -;;:L'::~:i..'--;-j- <br /> <br />. . -_ ,', ',-{,~<..,;-l.~;i~;::;~~:Z_-:;.;;~t;;~J_C_"( <br />,.Existing utility dispositlonJ i'1'pact d,;Ji{n(rhtsame <br />four'~~i_sp?sition plan~", torI'sisti'rlg' o(pl,ah'yiew only <br />sheets~r}~ 20' scale will..isosllO\V aletor all related <br />utility re19cati?,J?s;_-adjus~~,en:s abd rem6~als, however, <br />all overhead utilities will be designed as a part of a <br />new underground system by the utility owners (SCE, <br />Pacific Bell & CATV) and the existing 36" MWD water <br />facilities that are impacted will be designed by MWD <br />(see Photo 8). Harris will design City related utility <br />impacts, including fire hydrant assembly relocations, <br />water and sewer related adjustments and relocations <br />of laterals, if any) Note: Harris & Associates already <br />obtained an electronic utility detection survey of Bristol <br />Street, from McFadden Avenue to Third Street, as part of <br />the mainline storm drain design project (see Exhibit 2), <br />thus we already know all of the horizontal and vertical <br />locations of all of the existing utilities within the project <br />reach (accurate [0 within 6-inches +/-). Thus, for the <br />Harris Team, there will be zero starr up time with regards <br />to the required utility coordination for the project. <br />The need for potholing existing utilities will be greatly <br />teduced because of the utility work already done by the <br />Harris Team, however, a contingency line item to provide <br />up to two days of utility potholing has been included in <br />the fees in the unlikely event that it should be required. <br /> <br />~ <br /> <br /> <br />(" t.(\ueatlon 1St .- <br />;" ~ <br /> <br /> <br />::~ <br /> <br />Traffic Design Elements <br /> <br />Harris & Associates will perform all of the traffic design <br />elements in house, which will primarily consist of the <br />following: <br /> <br />. Traffic Signal Modifications (two signalized <br />intersections, namely, at McFadden Ave and Bishop <br />Street, see Photos 1 & 6) <br /> <br />. Traffic Signing & Striping design (for plan view only <br />sheets at I" ~ 40' scale, extending 300' north of Pine <br />Street, 300' south of McFadden Avenue to ensure proper <br />transitions I joins with the previous widening projects at <br />each end, see Photo 2) <br /> <br />. Traffic Signal interconnect design (two plan view only <br />sheets at 1" ~ 40' scale) <br /> <br />. Streetlight design (two plan view sheets at I" ~ 40' scale) <br />similar to Bristol Street south of McFadden (see Photo 4) <br /> <br />. Traffic Control & Phasing Plam (up to six plan view <br />only sheets at 1" ~ 40' scale) <br /> <br /> <br />Photo 7 - Parkway Grading: At some high properties, see <br />existing retaining wall, there may be a need to retain the <br />grades behind the proposed sound wall. depending on whether <br />the grade differences can be made up within the ptoposed <br />parkway. Thi. will likely be possible in the wider parkways but <br />a retaining wall of .ome .ort may be unavoidable in some of <br />the narrower parkway areas. <br /> <br /> <br />Photo 8 - Utility relocations: We will proactive~ <br />coordinate the utility relocation. that will be required <br />throughout the project limits. While tity owned utilities, such <br />as the fire hydrant shown, will be relocated per our Bri.tol <br />Street plan. other farilities, .uch as MWD'. 36" waterline and <br />appurtenances (see tan tolored vent pipes, pedestal and access <br />vault) and overhead lines (owned by SeE, Pacific Bell and <br />Adelphia CATV) will be relocated or converted to underground, <br />tespectively, per separate plans prepared by the utility owners. <br /> <br />=1 Harris & Associates. <br /> <br />Bristol Corridor Widening - Phase I <br />Page-6- <br />