Laserfiche WebLink
<br /> <br />a <br /> <br /> <br />;:<~.~tJon 1st .-<t <br />~, ;.,~ <br /> <br />,';'j;-; <br /> <br />.".'. removals, relocations, adjustments and/or <br /> <br />. existing and proposed RJW locations and identifYing all partial <br /> <br />. and profiles, complete with medians <br />. Proposed latetal inlet designs (plan and profiles - complete with utility crossings) <br />. Catch basin locations, types and sizes (complete with potencial conRicts with existing improvements) <br />. Typical storm drain trench section(s) and pertinent details. <br />. Utility impacts (relocations, adjustments and/or modifications). <br />. Preliminary signing & striping plans <br />. Pteliminary traffic signal plans <br />. Preliminary traffic signal interconnect plans <br />. Preliminary streetlight plans <br />. Pteliminary sound wall plans <br />. Pteliminary gtading plans <br />. Conceptual planting plans (borh parkways and medians) <br />. Preliminary comprehensive cost estimates for comparison with the City's construction budgets. <br />. A list of items requiring City feedback, along with the Harris Team's associated recommendations <br /> <br />Task E: City Staff Feedback Meetings <br /> <br />Set several meetings with City staff to present and discuss results of the conceptual designs and reach concurrence <br />on the project elements. From the approvals received at this feedback meetings the Harris Team will proceed to the <br />final construction plan preparation, to help ensure that the best solutions are achieved that are within the existing <br />budget constraints. <br /> <br />Phase III: Construction Documents <br /> <br />The Harris Team will utilize a recent applicable electronic City of Santa Ana sample ptojecr PS&E, provided by <br />City staff, as a starring point for the project. All of rhe final plans will be issued in Mictostation format. <br /> <br />Task A: Construction Plans <br /> <br />1. Prepare one (1) Project Title Sheet that includes general notes, location map. utility contact information and <br />sheet index. <br /> <br />2. Ptepare two (2) Roadway Typical Section & Detail Sheets showing the proposed roadway typical secrions and <br />various street construction details required. <br /> <br />3. Ptepare four (4) Disposition Plan Sheets at I" = 20' scale, with rwo Strips per sheet, showing the disposition <br />of I impacts to all of the of the existing improvements, including whether the existing improvements are to be <br />protected in-place, removed, adjusted, relocated, modifications, salvaged or abandoned. Also included on these <br />sheets will be all anticipated utility impacts. Each item will be clearly defined as to whether the wotk is being <br /> <br />= I Harris & Associates. <br /> <br />Bristol Corridor Widening - Phase I <br />Page-13- <br />