Laserfiche WebLink
A <br />7 <br />D. Proposed schedule indicating stages of work, time frames, and ability to <br />perform the required services in a timely manner. <br />E. Proposal submittal and signature. Six (6) copies of your proposal shall be <br />signed by a company official with the power to bind the company in its <br />proposal. All proposals must be completely responsive to the RFP. <br />111. PROPOSED SCOPE OF SERVICES <br />A. DESCRIPTION OF WORK <br />The Consultant shall perform architectural, structural, mechanical, <br />electrical, and services resulting in <br />contract documents for the roiect de'cribeZi—below. <br />El Salvador Center Renovation <br />The improvements for this project include re -roofing the existing building, <br />installation of an HVAC system, installation of a fire alarm system, <br />renovation of existing electrical services and fixtures throughout the <br />building and site, renovation of plumbing services and fixtures throughout <br />the facility, interior painting throughout the facility, ADA compliance <br />throughout the facility, renovation of the existing restrooms and showers <br />for ADA compliance and general improvements, renovation of the Game <br />Room including new acoustic ceiling, carpet flooring, and windows, <br />renovation of the Multi -Purpose Room including new wood flooring, <br />acoustic ceilings, new cabinets, and ballet bars and mirrors, renovation of <br />the kitchen including new tile, plumbing, and linoleum flooring, renovation <br />of the Arts and Crafts Room including new linoleum flooring, cabinets, <br />acoustic ceiling, and windows, renovation of playground equipment, <br />renovation of the Gym including new wood flooring, bleachers, <br />backboards, scoreboard, interior doors, acoustic walls and ceiling, and <br />windows, renovation of the Ceramic Room including new windows, <br />acoustic ceiling, carpet flooring, and new interior walls, doors, and frames, <br />Entry Hall improvements including interior wall construction, acoustic <br />ceiling, lath & stucco, exit doors and hardware, carpet flooring, and <br />Miscellaneous Exterior improvements including lighting, sidewalks, lath & <br />stucco, signing, and exit doors. <br />B. PRE -DESIGN MEETING <br />1. Meeting shall be coordinated by City's Project Manager. <br />2. Discuss project scope with Design Review Team to review and refine - <br />design criteria, program objectives, specific areas of concern and <br />goals. <br />5 <br />